Presentation is loading. Please wait.

Presentation is loading. Please wait.

Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.

Similar presentations


Presentation on theme: "Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011."— Presentation transcript:

1 Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011

2 2 Coastal Ecosystem Dynamics Imager (CEDI) Block Diagram – IDL Baseline Scan Mirror Primary Mirror Telescope “Aft” Optics External Baffle Enclosure Optical Bench Band 2(600-900 nm) SIRU Star Trackers (3) (orthogonally mounted) Aperture Cover (closed during solar cal) Band 1 (345-600nm) SWIR Band Slit MCT H2RG 2Kx2K HyVISI TCM8050A Custom 1K x 2K HyVISI TCM8050A Custom 1K x 2K Calibration Source Thru-hole Aperture Door Launch Lock Detectors Volume - 7.5 m 3 Mass - 621.4 kg Power - 392 W

3 I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t D e s i g n L a b o r a t o r y GEO CAPE Study Week: 1/25 – 1/29/10 Presentation Delivered: Jan 29, 2010 Use or disclosure of this data is subject to the restriction on the title page of this document Mechanical Systems, p Final Aperture & Calibration Covers Opened 2-Sided Diffuser plate Scan mirror mechanism Solar Calibration View Lunar Calibration & Nadir Science Views

4 Why? Desire to reduce instrument volume to allow payload to be hosted on other missions “Minimally acceptable scientifically viable mission”….help to define this from the bottom up GEO-CEDI (IDL) at 7.5m 2 too large to allow hosting on some platforms Study will evaluate architecture & packaging trades to reduce volume.

5 Volume Comparison GEO-CEDI (IDL) 7.5 cubic meters GEO-MDI 15.3 cubic meters GEO-CEDI (IRAD) 4 cubic meters?

6 Trade Space The merit function is lowest volume, then lowest cost. Several parameters will be traded: 1.Alternate optical packaging, Eff F/#, folding, etc. 2.Reduce gimbal size, alternate gimbal architectures 3.PPS / Jitter control implementation 4.Alternate calibration schemes 5.Primary Mirror scaling Some parameters will not be traded: 1.Instrument architecture (Offner Relay slit spectrograph) 2.Spectral range and channel count

7 Gimbal Traditional elevation over azimuth type is baseline Evaluate flexure suspension XY scanner; analogous to large, “slow” steering mirror Evaluate transmissive cal with XY scanner only –Trade large air gap voice coils vs. limited angle torque actuators

8 Alternate Optical Packaging Faster telescope “out of plane” folding options to enable more space efficient packaging –Additional fold optics required –Additional optics (periscope/K mirror) may be required to maintain slit orientation after folding Current “IDL” layout shown

9 Out of Plane Layout Channel 1 HyViSi ROIC 345 – 600 nm Channel 3 H2RG 1225-2160 nm Channel 2 HyViSi ROIC 600-1100 nm 120mm FSM in periscope Slit channel 1+2 Slit channel 3

10 Calibration Specular calibration –IDL concept has deployable calibration assembly, and required 3 mechanisms for 2 specular targets Transmissive calibration? Can we reduce number of calibrators? Diffuser Plate Select Mechanism Double sided diffuser Cover Mechanism Launch Lock

11 Precision Pointing System (PPS) Add the JHU/APL PPS which utilizes FSM+star tracker+inertial reference (gyro) system to increase S/N, cancel S/C and self jitter –Coupled with scanning gimbal How do I get smaller by adding more components?

12 Alternate Layout

13 Future Work Complete mechanical sizing trade Add structural, thermal, optical bench detail GEO-CEDI (IDL) 7.5 cubic meters GEO-MDI 15.3 cubic meters GEO-CEDI (IRAD) <7.5 cubic meters


Download ppt "Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011."

Similar presentations


Ads by Google