PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.

Similar presentations


Presentation on theme: "PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE."— Presentation transcript:

1 PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE

2 PACS SVR-II 18 January 2007 FM ILT overview2 The PACS FM ILT started with warm short functional tests (SFT Warm) on October 12-18 Cold tests were executed between October 31 and December 22, based on the test plan (B) that was introduced by U. Klaas in the previous presentation Phase I of the PACS FM ILT ended on January 4 with another SFT Warm

3 PACS SVR-II 18 January 2007 FM ILT overview3 Progress was very good! All planned tests were executed (sometimes ahead of schedule), except one test block (photometer set- ups III), which was replaced by further tests of the spectrometer (including red!) (Preliminary) analysis reports exist for most of the tests (see below and the following presentations, see also the SVR-II web page), but naturally some test data carry further information that still needs to be extracted.

4 PACS SVR-II 18 January 2007 FM ILT overview4 most of the mechanisms (grating, filter wheels, calibration sources, hetaers, flashers, OGSE mechanisms, xy-stage, etc.) are functional and perform as requested the bolometer and spectrometer detectors seem to be in spec (NEP) PSFs and spectral resolution seem to be in spec autonomous operations (long tests over night) were possible the Lens laser setup worked extremely well stable DECMEC (but QM) data analysis, mostly within PCSS, much more routine-like (and faster) than at CQM ILT

5 PACS SVR-II 18 January 2007 FM ILT overview5 the chopper is non-conformant the spectrometer slicer unit is non-conformant no DECMEC FM yet

6 PACS SVR-II 18 January 2007 FM ILT overview6 Original Plan was to warm up at the end of Phase I in order to replace the DECMEC QM with the DECMEC FM (see previous talk by U. Klaas) However, the chopper non-conformance required a full warm up and opening of the cryostat to inspect and possibly exchange the chopper The chopper performance was good enough to continue the planned tests of phase I without information loss In order to characterize the spectrometer as much as possible to detect potential major problems before opening the cryostat we decided to expand the spetrometer test program in phase I For tests of the red spectrometer we needed to connect the red Ge:Ga array to the blue DECMEC (switching cable connections at 40K).

7 PACS SVR-II 18 January 2007 FM ILT overview7 The PACS ICC at work

8 PACS SVR-II 18 January 2007 FM ILT overview8

9 PACS SVR-II 18 January 2007 FM ILT overview9 Test blockexecutionreport status SFT Warmcomplete - „SFT Warm Chopper and Internal Calibration Sources“ - “Functional and Performance Tests of Mechanisms“ Bolometer LTU testscomplete - „Report on the FM ILT PhFPU functional tests“ SFT He Icomplete - „Report on the FM ILT PhFPU functional tests“ - „Functional and Performance Tests of Mechanisms“ - „SFT HeI Chopper and Internal CS on 31 October“ available / Name on SVR-II web page OGSE characterisation Iacomplete - „OGSE Characterisation during CQM/FM ILT“ Control Loop optimisationcomplete - „Functional and Performance Tests of Mechanisms“ - „Basic Drive Parameters Chopper.... “ - „Angular Calibration of Chopper (PCD 2.3.1)“ - pending: report on CS

10 PACS SVR-II 18 January 2007 FM ILT overview10 Test blockexecutionreport status SFT He IIcompletepending, but see briefing minutes (14 Nov) Thermal behaviourcomplete (draft) - „Thermal behaviour tests during FM-ILT...“ OGSE characterisation Ibcomplete - „Angular Calibration of Chopper (PCD 2.3.1)“ - „Further investigations of chopper angle....“ available / Name on SVR-II web page Photometer set-ups I (basic) complete - „Are the three modes....correctly interpreted?“ „all tests successful“ See presentations by H. Feuchtgruber and M. Sauvage photometer & spectrometer Lens Laser testscompletepending, but initial results on leaks, PSF, spectral resolution, wavelength calibration; see briefing minutes and presentation by H. Feuchtgruber Plus spec AOT mode tests plus addtional tests

11 PACS SVR-II 18 January 2007 FM ILT overview11 Test blockexecutionreport status Photometer set-ups II a/bcompletepending, but initial results on optimal bias and NEP; see presentations by M. Sauvage and A. Poglitsch Spectrometer calibration Icompletepending, but see presentation by plus RED !H. Feuchtgruber OGSE characterisation IIacompletepending, but optimal focus position was plus spectrom. determined and used in the further tests (see focus!briefing minutes (8 Dec) and presentation by M. Sauvage available / Name on SVR-II web page (wavelength cal. vapour cell) (optimal settings) (photometer focus) OGSE characterisation IIbpartiallypending, partially in - „Bolometer FOV Chopper Scans...“ (photometer)

12 PACS SVR-II 18 January 2007 FM ILT overview12 Test blockexecutionreport status Photometer set-ups IIInot doneinformation partially in other tests Spectrometer characteris.pending, but results are extracted; see presentations by H. Feuchtgruber and A. Poglitsch  slicer NRB available / Name on SVR-II web page (FOV scans, AOT mode tests, grating scans in different resolutions, i.e. SED, low, medium, high resolution, line scans, point source rasters, slicer NRB investigations) (signal dependencies, pixel offsets, low frequency noise, time constants...) Additional tests with blue *AND* red spectrometer:

13 PACS SVR-II 18 January 2007 FM ILT overview13 The Christmas Event PACS Observations of Ursa Major and Ursa Minor on 22 December 2006 All data rights: A. Poglitsch

14 PACS SVR-II 18 January 2007 FM ILT overview14 OGSE characterisation I (basic function & performance) : complete OGSE characterisation II & III: partially, needs to be repeated (partially) photometer set-ups I and II (basic and optimal settings): complete spectrometer initial characterisation AOT like tests autonomous tests Summary:

15 PACS SVR-II 18 January 2007 FM ILT overview15  Mechanisms characterised (except chopper)  Photometer: optimal settings, and basic characterisations of PSF, spatial distortion, NEP, FOV,...  Spectrometer: basic characterisation of PSF, instrumental (line) profiles, wavelength calibration, spectral resolution, relative spectral response, leakage and ghosts, FOV, NEP,...  slicer non-conformance  chopper non-conformance Full calibration yet to be done for both photometer and spectrometer More details in the following presentations