1
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours
2
Novemebr 5, 2006LSC meeting2 Recent Activities Commissioning activity focused on Detector/Sensitivity improvements: Fix & optimize a faraday tuning Add acoustic isolation in the laser lab Coil drivers electronic upgrade Increase the clear aperture of a window Beam Matching/centering Controls tuning… Almost shot noise limited at high frequency Started Week-end Science Run (WSR) Take data during week-end Shake down the shifts organization, on call procedures, data transfer… Provide stable data for online analysis, noise studies, and offline pipelines 2 WSR in Sept with good duty cycle (88% and 69%) 2 WSR in October canceled due to interferometer instabilities Recovery from faraday tuning and acoustic enclosure work not completed at that time Only one week time between the two of them
3
Novemebr 5, 2006LSC meeting3 Virgo WSR1 sensitivity
4
Novemebr 5, 2006LSC meeting4 BNS Horizon BNS Horizon, optimal orientation; SNR=8; WSR1 WSR2 Red curve = 2.7 Mpc-(wind+sea) WSR1 Red curve: 2.7 Mpc -(wind+sea) WSR2
5
Novemebr 5, 2006LSC meeting5 WSR1: BNS Triggers(0.9-3M ) Basic cuts + reflected power (“B2”) stability
6
Novemebr 5, 2006LSC meeting6 WSR1: Burst Triggers (MF) SNR>15 White noise + HI Photodiode B1d2 or B1d3 saturation Limited set of basic cuts Ongoing study to define data quality cuts / vetoes
7
Novemebr 5, 2006LSC meeting7 WSR1 Noise Budget Control noises (PR, BS) Actuators noise Frequency noise shot noise
8
Novemebr 5, 2006LSC meeting8 What next ? Next months: Some detector work: Add wedges on some auxiliary beams, Additional acoustic enclosure Continue Commissioning Improve stability vs weather – Work on the controls (suspension, alignment, …) Noise hunting Focus on the intermediate frequency band One WSR every 3-4 weeks according to schedule of hardware changes At least one week of noise hunting before a WSR Move to 24/7 Science data taking We want several months of coincidence with S5 We need to match the LIGO sensitivity in part of the spectrum Starting date TBD, in the first part of 2007 2008: Shutdown for Virgo+ 50W laser, Monolithic suspension, new digital electronics …