Download presentation
Presentation is loading. Please wait.
Published byMyra Hood Modified over 9 years ago
1
INFSO-RI-508833 Enabling Grids for E-sciencE www.eu-egee.org EGEE 1 st EU Review – 9 th to 11 th February 2005 CERN
2
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 2 Content SA1 – Core Infrastructure Centers –Definition –Operational tool Cic Operations –Cic-on-duty Definition Procedure Operations –Monitoring tools Scenarios of escalation –Severity –Deadline Expiration Next steps
3
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 3 –Operate essential grid services and act as Grid Operation Center –Objectives Transparency Information sharing - 24x7 Troubleshooting in conjonction with ROCs –Current state of operations Procedures defined and used Monitoring tools and in-depth testing Communication tool Problem Tracking Tool CIC [This sketch has been provided by Pierre Girard] [This map has been provided by Matt Thorpe] CIC RC ROC RC ROC RC ROC RC ROC RC OMC
4
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 4 CIC Web Portal http://cic.in2p3.fr/ Objectives of CIC portal –Centralized tool for Egee actors to use Functional needs –Communication tool for inter-operability Needs and feedback CICs pro-active resolutions –Provide a repository Knowledge: configurations, published sites data, Faqs Procedures and processes Existing tools
5
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 5 Cic-on-duty Cic–on-duty agenda weekly shifts – 8/5 GGUS, ROC User-support, mail Monitor, diagnose troubles Contact site administrators, ROC Problem Tracking Tool Follow-up GDA meetings COD meetings Log file
6
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 6 Cic operational procedure [This procedure is provided by OMC] High level abstraction of core tools results Link all existing tools monitoring diagnosis communication mail follow up log CIC Operations https://cic.in2p3.fr/index.php?id=cic&subid=cic_dash2 Ops Procedure
7
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 7 Cic-on-duty Dashboard https://cic.in2p3.fr/pages/cic/framedashboard.html All-in-one dashboard
8
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 8 Selection of Monitoring tools GIIS MonitorGIIS Monitor graphs Sites Functional Tests GOC Data Base Scheduled Downtimes Live Job Monitor GridIce – VO viewGridIce – fabric viewCertificate Lifetime Monitor Note: Those thumbnails are links and are clickable.
9
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 9 Scenarios of escalation : 1/2 TZR GIIS Goc Wiki Ticket status
10
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 10 Scenarios of escalation : 2/2 1st mail Blacklist Deadline Problem still there Next deadline Action taken
11
Enabling Grids for E-sciencE INFSO-RI-508833 LCG-EGEE Operations 11 Next steps Unification of information coming from various test tools Move to GGUS [This display based on RGMA is provided by the russian federation] http://www.ggus.org
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.