Download presentation
Presentation is loading. Please wait.
Published byMarjory Perkins Modified over 9 years ago
1
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
2
Introduction TG Committee consists of 81 members Meetings started in June 2013 with typically 30-35 members per meeting Held approximately nine WG meetings to date TG approach – Build worklist (cut-off for items was August 2013) – Identify Teams and Team Captains – Divide worklist between teams – Meet as teams to resolve work items
3
Work Teams/Captains – Design / Jean Brunjes – Materials, Welding and Cladding / Sterling Lewis – Organization / Eric Wehner – Qualification / Tom Lambert – Quality / Mike Briggs – Documentation Specialist / Jill Bell – Co-Chairs / Eric Wehner & David Zollo
4
Worklist Currently there are 155 items in the worklist Several Items that needed roundtable discussion – Overall document organization ideas – EW EW will study new structure and propose ideas to TG – Metric conversion issues – EW Studying changes ranging strict conversion from metric to fixing critical bore and interface clean-up – Reference C/L – JB Will remove triple & quad multiple completions from rewrite – Alloy 625 Overlay Minimum Thickness Limit – DZ Will determine a way to provide for minimum overlay thickness – Annex ordering issue – EW Trying to keep references the same for frequently referenced Annex’s Will remove Annex H (Tools) and create TR at a later date
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.