Presentation is loading. Please wait.

Presentation is loading. Please wait.

FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1.

Similar presentations


Presentation on theme: "FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1."— Presentation transcript:

1 FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1

2 FY09 EMIS Redesign (EMIS-R) 2 ODE has decided that E.M.I.S – Education Management Information System Should be redesigned to be…

3 FY09 EMIS Redesign (EMIS-R) 3 ODE has decided that E.M.I.S – Education Management Information System Should be redesigned to… E.M.I.S. – Every Morning I Scream

4 4 EMISEMIS EMISEMIS

5 What is the redesign? Multi-year project to completely redesign EMIS for Ohio schools Modified vertical reporting structure Changes in how data gets from NWOCA to ODE Current: Flat files submitted to ODE Future: XML-based structure built upon SIF 5

6 What is SIF? More information at http://www.sifinfo.org/ http://www.sifinfo.org/ SIF = Schools Interoperability Framework SIF enables diverse applications to interact and share data related to entities in the pK-12 instructional and administrative environment. 6

7 SIF consists of… Software Application (i.e. eSIS): Software program implemented within a school or district SIF Data Object: Sets of information shared by software applications using the rules of the SIF Specification SIF Agent: A software program (written by a vendor) that serves as the intermediary between the software application and the SIF Zone ZIS (Zone Integration Server): A software program that serves as the central communications point in a SIF Zone 7

8 Copyright © SIF Association Components of SIF Zone Integration Server Software Routing Access Control SIF Agents Communicate with ZIS Assemble and process messages Data Objects Sets of information XML Network Account H.R. & Finance Data Analysis & Reporting Instructional Services Library Automation Grade Book Food Services Student Information Services

9 Copyright © SIF Association District Zone State Zone SIF Zones Logical grouping of applications, agents, and ZIS Highly flexible and scalable Library Automation Food Services Student Information System Network Account Transportation Student Information System No predefined size or structure… specific to your implementation

10 Copyright © SIF Association Components Working Together Vertical Interoperability District State

11 What does this mean to you? NWOCA is a pilot for the EMIS Redesign Pilot testing to begin December 2008 What does this mean next year? Districts will likely see very little direct interaction with the SIF pilot. Aggregations and submissions will still be processed in the same manner next year Districts WILL start to see changes in the EMIS files and data structures. 11

12 What will be changing? See FY09 EMIS Manual – Appendix Y for more details Three new record types Student Standing (FS) Student Attributes- Effective Date (FD) Student Attributes- No Date (FN) Smaller Student Demographic (GI) No more Student Attendance (GK) 12

13 Effective Dates Present on FS and FD records Provide continuous values for elements where needed by ODE New record when values change Open versus Closed record Report first day of school to end of reporting period- cumulative for year Example improvements: OE funding, yearend attendance 13

14 Student Standing (FS) Relationship of student to district Attending and Assigned Building How Received (Student Status) Sent Reason (A/H Indicator) x 2 Received and Sent IRNs 14

15 Student Standing (FS) Tuition Type Attendance Counts x 3 Effective Dates Multiple SSIDs (rare) Percent of Time split Admission/Withdrawal date/reason 15

16 More Changes…. The addition of the FS, FD, and FN records will be the biggest changes (along with the adjustments to the existing GI record). More information to come as it becomes available. 16

17 Questions on FY09 Redesign? 17

18 eSIS Update Visit website - http://home.nwoca.org/students/esis/http://home.nwoca.org/students/esis/ Phase I Ayersville, Tinora, Edon, Maumee, and Lake Fully live Phase II Doing well; currently working through scheduling and conversions Fully live start of 2008/2009 school year Phase III Commences next fall and includes ALL remaining districts currently using McSIS/POISE Communication coming early next week 18

19 Questions on… 19


Download ppt "FY09 Redesign Who has heard of it? What is it? What does it mean to you next year? 1."

Similar presentations


Ads by Google