URA Review – May 8, 20061 US CMS – RP, FNAL CMS Research Program (FNAL) Dan Green US CMS RPM May 8, 2006.

Similar presentations


Presentation on theme: "URA Review – May 8, 20061 US CMS – RP, FNAL CMS Research Program (FNAL) Dan Green US CMS RPM May 8, 2006."— Presentation transcript:

1 URA Review – May 8, 20061 US CMS – RP, FNAL CMS Research Program (FNAL) Dan Green US CMS RPM May 8, 2006

2 URA Review – May 8, 20062 OutlineOutline LHC Science – EPP2010 Status of CMS Construction – CD4-A, 97% complete Magnet HCAL ME Construction- CD4-B, SiTrkr FPix Physics Preparation Computing TDR Physics TDR Research Program US CMS Collaboration@ FNAL LPC ROC/LHC@FNAL CMS Dept.

3 URA Review – May 8, 20063 LHC w.r.t. EPP2010

4 URA Review – May 8, 20064 CMS Magnet Cold. Inserted HCAL in April. Field map and quench studies in summer, 2006.

5 URA Review – May 8, 20065 HCAL Installation Progress An initial set of calibration constants for all HCAL – HB, HE, HF exists based on test beams in 2004 and radioactive sources to carry over energy taken in 2005. Good to ~ 5%. Check in test beam in 2006 (with ECAL). Expect ~ 15% “brightening” in 4T magnet – to be tested and tracked.

6 URA Review – May 8, 20066 HCAL - Forward Staged in bldg #186. Calibration is ~ ½ complete. Plan to finish and move to SX5 for July installation in UX

7 URA Review – May 8, 20067 “Slice Tests” – HCAL muons

8 URA Review – May 8, 20068 ME Progress YE+ endcap installation finished -- 196 chambers YE- endcap finished except for ME-1/3 chambers (36) Chamber installation 91% finished Cabling now 80% finished TMBs starting to be delivered Slice test starting on YE+1

9 URA Review – May 8, 20069 9 ME2 + 9 ME3 chambers available (60 0 sector) Services in place: LV, gas, and HV 9 production TMBs and Peripheral Backplane ME+2 station Production TMBs arriving at CERN in February. 27 14 32 16 ME2 27 32 16 ME3 ME+2 ME+ 3 ME - Slice Test Setup

10 URA Review – May 8, 200610 HCAL ECAL RCT GCT GT/ GMT TTC DTTF CSCTF Central Integration Racks Mitigation – buy schedule using #904. Test Trigger, DAQ. DAQ segment is in SX5 with cosmic ray muon data logging.

11 URA Review – May 8, 200611 TOB - Rod Insertion, Cabling & Testing at CERN SiTrkr module production is complete. Will finish rod production at FNAL and UCSB by the end of summer. Installation is ongoing in the Tracker Integration Facility. Plan for 25% “slice” test in TIF before UX installation at end of CY06.

12 URA Review – May 8, 200612 FPix (baseline): US delivers: 4 ‘disks’ TBM (for CMS Pixels) Mechanical support and cooling Pixel Sensors Assembled pixel detectors The required electronics (adapter board, port card) except the: ROC, FEC, FED and OL ½-Disks: 12 Blades Blade: 2 Panels HDI, TBM Plaquette: Sensors, ROC, VHDI (picture later) Pigtail: Panels to Adapter Board Fan-in/Fan-out Extension Cable Port Card: AOH (2), DOH, ALT, Gate Keeper, TPLL, DCU FEC FED CMS DAQ ½-Service Cylinder O-fibers Power, Cooling Full Size Model. FPIX Status

13 URA Review – May 8, 200613 Construction M&O Operational Spares Main Detector ’07 Detector Calendar Year Schedule: From Construction to M&O Schedule for FPIX has completion of installation and switch to M&O in first ¼ of CY08. There is schedule float for CD4-B. All parts are just now in place and construction can begin. Detector Construction for FY06 is ~ 3.5 M$ at FNAL (direct) – used to complete SiTrkr and FPIX. There are ~ 28 FTE in FY06.

14 URA Review – May 8, 200614 Computing TDR Completed The Computing TDR represents the new paradigm after the problems with DC04. It is the blueprint for future progress.

15 URA Review – May 8, 200615 CPT Organization HLT/DQM E. Meschi Reconstruction T. Boccali Analysis Tools L. Lista Simulation M.Stavrianakou D.Elvira Calibr/alignment O. Buchmuller L. Malgeri Framework L. Sexton Software L. Silvestris A. Yagil Integration Program I. Fisk/S.Belforte Facilities and Infrastructure N. Sinanis Operations Program L. Barone Technical Program P.Elmer/S.Lacaprara Computing L. Bauerdick S. Belforte Project Manager P.Sphicas Project Office V.Innocente L.Taylor Fast Simulation P. Janot ECAL/e-  C. Seez Y. Sirois TRACKER/b-  I.Tomalin F. Palla HCAL/JetMET J.Rohlf C.Tully Muons N. Neumeister U.Gasparini PRS D. Acosta A. Deroeck Online Selection S. Dasu C. Leonidopoulos Higgs S. Nikitenko SUSY & BSM L. Pape M. Spiropulu Standard Model J. Mnich Heavy Ions B. Wyslouch Generator Tools F. Moortgat S. Slabospitsky ORCA for PTDR W. Adam SW Devel Tools S. Argiro Geometry M. Case

16 URA Review – May 8, 200616 Computing Model CMS CAF must be constructed. T1 resources pledged to CMS not sufficient for CMS requirements. Also requirements themselves are 2x below those of ATLAS. Much work remains.

17 URA Review – May 8, 200617 Physics TDR Volume 1 Volume I concerns detector performance and models. These items are crucial to predicting Physics performance of the CMS detector.

18 URA Review – May 8, 200618 FY06 – M&O in RP For FY06 M&O costs are ~ 14 M$. Of that ~ 4.2 M$ goes to university groups, while ~ 9.8 M$ goes to FNAL ( Cat A – PO – LPC - ROC ) - burdened

19 URA Review – May 8, 200619 FY06 - S&C in the RP FY06 S&C costs are ~ 15 M$. Of that 10.5 M$ goes to FNAL (T1 – LPC CAF – CP), while 3.5 M$ goes to university groups ( 7 T2 centers) - burdened

20 URA Review – May 8, 200620 US CMS Demographics Expect to grow to ~ 500 FTE physicists at ~ 49 institutions by first beam to CMS. March CMS Week – Rockefeller + Puerto Rico.

21 URA Review – May 8, 200621 Demographic Split of US CMS

22 URA Review – May 8, 200622 FY06 – Core Support Each FY, US CMS performs a bottoms up assessment of needs in the core program. The L2 managers set priorities, while the overall priority is defined by the RP management.

23 URA Review – May 8, 200623 FNAL Activities in CMS

24 URA Review – May 8, 200624 LPC at Fermilab Appears to be successful. WH11 filled and moving onto WH10 and WH1. Note unique open areas for Physics discussions.

25 URA Review – May 8, 200625 LPC Website Growth continues. WH11 ~ full. Expanding to WH10E

26 URA Review – May 8, 200626 ROC at Fermilab ROC to provide facilities for Data Quality Monitoring remotely. Improves effectiveness of remote experts and benefit from time difference (night shift). Have achieved good FNAL support. ROC will move to WH1 as a visible symbol of the FNAL commitment to CMS.

27 URA Review – May 8, 200627 WH1E – LHC @ FNAL First phase has begun. By end of FY06 have the control room and a teleconference center. Office space for shifters and data quality monitoring will come later.

28 URA Review – May 8, 200628 CMS @ FNAL - Dept. in PPD E892 at FNAL. Core Program budget in PPD is: 210 k$ M&S for M&O 175 k$ G&V 26 k$ SLHC R&D 88 k$ LPC Support (bulk comes from M&O) ------------------------------ ~500 k$ in M&S (large travel component) CMS Dept. in PPD has 43 FTE FNAL Physicists – 46 on M&O A. For TDR 96 FNAL names – Phys+CP+Eng SWF is ~ 4 M$ for core support (physicists) M&O is ~ 8.3 M$ (direct), 7.0 M$ in M&S ( Category A costs, HCAL ) with 1.3 M$ in SWF (RP Project Office, 8 FTE)

29 URA Review – May 8, 200629 CMS @ FNAL – Dept. in CD S&C in FY06 is costed at 8.8 M$ (direct). Of that 5.3 M$ is in M&S (T1 and LPC CAF), while 3.5 M$ is in SWF (T1 + LPC Ops). There are ~ 30 FTE working on S&C in CD for FY06. There are 8 FTE in the CD CMS Dept., with 90 k$ of M&S core support.

30 URA Review – May 8, 200630 WH10E Proposal LPC is overflowing – especially in the summer. Add slots for LPC. Also, with ROC move, more offices freed up on WH11. Must also accommodate the large “silicon” community arising from Run II + BTeV physicists.

31 URA Review – May 8, 200631 SummarySummary Construction is ~ on schedule – 97% complete at end of FY05. CD4-B – SiTrkr is ballistic. FPIX finally has parts in hand. Computing TDR and Physics TDR are done. RP is now the central management instrument of US CMS. US CMS continues to grow. FNAL is the largest group. LPC is forging ahead ROC is analyzing cosmic ray data. LHC@FNAL will soon be complete (end FY06). PPD and CD CMS Dept. hosts the Project/Program office and supports FNAL physicists working on CMS.