Download presentation
Presentation is loading. Please wait.
Published byAnissa Bertina Bond Modified over 9 years ago
1
CMS Tracker Week, CERN, 24-28 Oct 2005 25 Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università di Catania and INFN – Sezione di Catania
2
25 Oct 2005CMS Tracker Week - Bonding WG2 Salvatore Costa - Catania How bonding is going Our new (well, used, rented) Delvotec 6400 still bonds well We have renewed our leasing for 2006 to do the TEC prod At turn-on after summer vacation, found 2 electronics boards (Y, Z) dead replaced by factory, no charge, 1 week downtime Modules bonded so far with this machine: 180 / 360 Some peculiar Module failures connected with Bonding: –Seen first module where gold layer on HV pad on back is peeling away. May drag away the bonds with it: Module declared faulty Repair center –Since Sep we see many PA’s where bonds would not stick in one of these locations: 1-2, 27-30, 738-741, 767-768 Seen also in Bari. Suspect bad PA metallization in those (symmetric!) spots DEAD channels (plagued us with Hughes): still zero so far Pull forces still satisfactory: PA TA ~10-11 g, PA-Sen ~12 g
3
25 Oct 2005CMS Tracker Week - Bonding WG3 Salvatore Costa - Catania Recent PA-Sen pull forces
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.