Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Similar presentations


Presentation on theme: "Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico."— Presentation transcript:

1 Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

2 Time Meeting 2/17/2015 Beam center sliced through VTXZ 2 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 -12 cm < VTXZ < -9 cm

3 Time Meeting 2/17/2015 Beam center sliced through VTXZ 3 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 -9 cm < VTXZ < -6 cm

4 Time Meeting 2/17/2015 Beam center sliced through VTXZ 4 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 -6 cm < VTXZ < -3 cm

5 Time Meeting 2/17/2015 Beam center sliced through VTXZ 5 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 -3 cm < VTXZ < 0 cm

6 Time Meeting 2/17/2015 Beam center sliced through VTXZ 6 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 0 cm < VTXZ < 3 cm

7 Time Meeting 2/17/2015 Beam center sliced through VTXZ 7 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 3 cm < VTXZ < 6 cm

8 Time Meeting 2/17/2015 Beam center sliced through VTXZ 8 Trigger: isL1==1 || isnarrow==1 || isnovtx == 1 || isnovtxANDzdc == 1 6 cm < VTXZ < 9 cm

9 Time Meeting 2/17/2015 ZDC Issues SMD north issues – swapped cables. – Hopefully being fixed as we speak 12/10/2014Douglas Fields 9

10 Time Meeting 2/17/2015 Run 422020 – Radiographs from hits Mostly alive except some areas in SE. Couple hot-ish spots in NE3, NE5 station3, which we have seen each year. FVTX Status

11 Time Meeting 2/17/2015 Run 422020 South (left) and North (right) track radiographs. Good coverage everywhere. FVTX Status

12 Time Meeting 2/17/2015 Run 422020 Efficiency at 3 rd plane, extracted from plane 1-2-4 tracks Primary missing area is SE2 where there are missing latches that tend to get missed NW0 NW2NW3NW1NW4NW5NE0NE1NE2NE3NE4NE5 SW5 SW3SW2SW4SW1SW0SE5SE4SE3SE2SE1SE0 FVTX Status

13 Time Meeting 2/17/2015 CB North ADC Counts - pedestals MPC-EX ● Can readout pedestal from both North and South ● No Beam Clock issues in North or South ● Both have Packet Length issues ● Parity issues in South CB, but not North ● Still need to solve the 2 word loss issue ● Work is going on in parallel, through the entire chain.

14 Time Meeting 2/17/2015 Summary Taking physics data for HF in Muon and Central arms. MPC-EX is beginning to read real data into PHENIX DAQ, and the entire chain is being tested. 12/10/2014Douglas Fields 14