Download presentation
Presentation is loading. Please wait.
Published byAbigayle Shepherd Modified over 9 years ago
1
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 1 G EOSS A nd M AHASRI E xperiment in T ropics (GaME-T) Taikan Oki and Shinjiro Kanae Institute of Industrial Science The University of Tokyo
2
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 2 Building Up GaME-T Target Area and Coverage Demonstration project of “hydro-meteorological forecasting” in Mae Waang, Chiang Mai, Thailand Flux measurements at a few landscapes Meteorological monitoring (+ data collection) and modeling all over the Indo-China Peninsula Possible collaborations with Vietnam, Malaysia, Laos, Cambodia, Myanmar,... + Thailand Call for specialists Winter monsoon, Aerosol (Phimai site is there), Seasonal Forecast, IWRM, risk communication, …
3
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 3 Site description Mae Wang basin in Chiang Mai (basin area : 600 km 2 )
4
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 4 Air Temperature & Humidity Wind Speed & Direction : Soil Temperature : Soil Moisture 2.7m Short & long-wave radiation -5cm -10cm -20cm -40cm Rain Fall 1.0m 2.0m Ground Water Level Air pressure in Data logger box River Water Level Instrumentation : Tel-super site NO.1 Making well at NO.4
5
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 5 Air Temperature : Soil Temperature -5cm Rain Fall 1.0m 2.0m Data logger box Instrumentation : Tel-rain site NO.8 NO.13
6
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 6 Instrumentation : Tel-rain site (with river level observation) NO.12 NO.11 Air Temperature Rain Fall 1.0m 2.0m Data logger box River Water Level Water Temperature
7
Data transfer every 1 hour from all observation sites Instrumentation : Data acquisition and Telemetry system Data logger GSM modem Data is logging every 5 seconds and recorded by averaging every 10 minutes. Tel-super system can storage data for 6 month, Tel- rain system can storage data for 1.5 month. GSM is easily able to connect line directly by dial- up connection, although GSM (9.6 kbps) is low-speed access than GPRS (115 kbps). GEOSS Data Server at RID Center 1 GEOSS Data Archive System at the Univerisuty of Tokyo
8
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 8 Historical Record Hindcast Telemetering, Remote Sensing Nowcast Coupled Land surface Model & Hydrological Model Surface Parameters precipitation, temperature, radiation, wind, humidity, … Soil properties, vegetation index, human factors, … Disaster Potential, Information for Decision making, … Physical Parameters to Information for People Web Interface/Effective Warning etc. PUBLIC Forecast Atmospheric Numerical Model River discharge, soil moisture, ground water recharge, …. Multi- Model Real time “PUB” - the Future! Multi- Forcing
9
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 9 THANK YOU! Friends, the hydrologists, can we fix it? Yes we can! (at least in the future)
10
http://hydro.iis.u-tokyo.ac.jp/GAME-T/ http://game-t.nrct.go.th/GAME-T/ 10
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.