Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011
2
Plan Rendering of Underpass Profile Plan of Detour Schedule Sample Pictures of Other Underpasses Sample Pictures of Possible Facades Lighting Topics to Be Covered
3
Pedestrian Underpass Plan
4
View from West Campus
5
View from Stadium
6
View from Popodicon
7
WV Route 480 Profile
8
Shepherd Grade Road Profile
9
February 2012 Begin Utility Relocation: Water, Sewer, Storm Sewer, & Overhead Utilities March 2012 Begin Detour Construction April 2012 Complete Utility Relocation Complete Detour Construction May 2012 Close Road & Open Detour Schedule
10
Mid-July 2012 Complete Retaining Wall, Underpass Structure & Roadway Open Rt. 480 to Traffic August 2012 Remove Detour at Campus Drive Connect Campus Drive and Shepherd Grade to Rt.480 Complete Excavation & Sidewalks on Both Sides of Underpass Open Underpass for Student Use September 2012 Remove Detour & Restore Bavarian Inn Property October 2012 Complete Wall Restoration, Cleanup, Seeding & Closeout Schedule
11
Detour Plan
13
Underpass with Stone Formliner
14
Golf Course Pedestrian Underpass
16
Antietam Drystack Facade
18
Missouri Old Cut Ashlar Facade
19
Colonial Stone Facade
20
Proposed Lighting
21