1
Chilmark Menemsha Harbor Phase 3
2
Menemsha Boathouse Fire July 2010
3
PHASE 1 - 2010 Removal of fire damaged facilities and installation of Concrete Floating Dock.
4
PHASE 2 - 2011 Construction of Pier Connector and Utilities.
5
PHASE 3 – FALL 2012 Replacement of 230 foot Transient Yacht Dock Replacement of 50 foot Fuel Dock Various repairs to town docks
6
Menemsha Harbor Phase 3 LOCATIONS 1.Transient Dock 2.Fuel Dock 1 2
7
Menemsha Channel
8
Fuel Dock underwater
9
Fuel Dock
10
Transient YACHT DOCK
11
Yacht Dock Profile
12
Yacht Dock Pier footprint
13
Sample Wood Deck Floats
14
Another Wood Deck Float
15
Menemsha Basin
16
Thank You. Special Town Meeting presentation August 6, 2012