1
1 Four Proposals from Oconee County
2
2 We are all unique and have different experiences and perspectives. **** Opportunities And Challenges
3
Opportunities Two Water Crossing Improvements Low Water Bridge Road - Ford Land Bridge Road - Bridge Two Road Improvements West Village Creek Road Brushy Mountain Road
4
4 General Area for Oconee County Improvements Reference Map: National Forest Lands in Sumter National Forest, Andrew Pickens Ranger District, Designated for Motor Vehicle Use
5
5 1 2 3 4 1. Land Bridge Road 2. Low Water Bridge Road 3. West Village Creek Road 4. Brushy Mountain Road Locations
6
6 CH-29 LAND BRIDGE ROAD Bridge Built in 1977 Spans the Chauga River Serves Recreational & Transportation Needs
7
7 CH-29 LAND BRIDGE ROAD Realignment Upgrade Structure Improve Drainage Improve Water Quality Project Includes:
8
8 CH-29 LAND BRIDGE ROAD IS A ONE LANE BRIDGE 2 TONS PER AXLE, 3 TONS GROSS “FUNCTIONALLY OBSOLETE” 1
9
9 2 LAND BRIDGE ROAD
10
10 3 LAND BRIDGE ROAD
11
11 The bridge has weight restrictions. In extreme cases this can cause an additional 7.26 miles of travel. In a sickness or fire, this much response time delay can make a critical difference. Emergency responders must determine the location of the emergency along Land Bridge Road and then determine if the road should be accessed from Verner Mill Road or Whetstone Road. Land Bridge Road
12
12 BRIDGE Approximately 2.44 miles from Mtn. Rest Fire Station Approximately 4.82 miles from Mtn. Rest Fire Station
13
13 CH-75 Low Water Bridge Road Project will: Improve Stream Crossing Improve Water Quality Improve Environment
14
14 Low Water Bridge Road has no bridge, but instead is a ford. It is located just beyond a primitive campground and must be crossed to provide access to residents and visitors to Snyder Cemetery. Low Water Bridge Road project will improve aquatic passage, public safety, wildlife habitat, decrease pollutants from vehicles passing through the water, and reduce sediment going into the Chattooga River.
15
15 CH-75 Low Water Bridge Road
16
16 CH-75 Low Water Bridge Road
17
17 CH-75 Low Water Bridge Road
18
18 CH -82 West Village Creek Road And PU-9 Brushy Mountain Road These projects include: Widen road. Increase sight distance. Provide safer passage. Provide better drainage.
19
19 West Village Creek Road
20
20 West Village Creek Road
21
21 West Village Creek Road
22
22 Brushy Mountain Road
23
23 Brushy Mountain Road
24
24 Brushy Mountain Road
25
25 West Village Creek Road and Brushy Mountain Road Provide a turn around for visitors and emergency vehicles Provide a wider driving surface. Slope and stabilize banks to improve sight distance near the curves. Provide all-weather driving surface. Improve forest and stream health by : Stabilizing roadside banks and ditches. Paving the road will prevent stone from washing off the road during heavy rains. Improve public safety by:
26
26 Project Fed. Agency Appropriated Contribution Requested Title II Contribution Other Contributions Total Project Costs Brushy Mountain Road N / A$36,000.00$76,000.00$112,000.00 Land Bridge Road$16,000.00$492,500.00$7,500.00$516,000.00 Low Water Bridge Road $14,000.00$100,000.00$35,000.00$149,000.00 West Village Creek Road $16,000.0048,000.00$88,500.00$152,500.00 The table below shows the approximate costs of the proposed improvement projects.
27
27