Download presentation
Presentation is loading. Please wait.
Published byJessie Collins Modified over 9 years ago
1
To Install or Not to Install: Why Businesses Choose On-Site Renewable Energy Michelle Miilu MA Office of Technical Assistance National Environmental Partnership Summit May 11, 2006
2
Background Renewable energy lead for office Concern about low % of manufacturers applying for state grants Driving forces and common ground Tool to identify good candidates
3
Information Sources Industry organizations State funding organizations Businesses with on-site renewables Industry currently in the installation process
4
Types of Businesses Food processors Plastics Pharmaceuticals Aluminum extrusion Semiconductors Inverter manufacturer Beauty salon
5
Main Concerns for Those That Install COST/BENEFIT ENVIRONMENTAL
6
Cost/Benefit Paybacks typically 5-10 years Certainty about future energy prices Large energy users minimize or cut costs while growing business Stay competitive
7
Environmental Reliance on fossil fuels GHG emissions Concern for employees Positive affect on regional air quality
8
Technology-Specific Concerns Availability of resource Structural/roof issues Efficiency of technology
9
On-site Renewable Energy is Not for Everyone Struggling businesses Low energy prices No energy efficiency effort Upper-level commitment is important
10
How to Choose the Right Renewable Availability of resource Energy demand of business Community acceptance
11
Good Solar Hot Water Candidates Have a relatively large demand for hot water Year around direct sun from 9am-4pm Space for installation Structurally sound location Beauty salons Plating Laundries Textiles Food processing Pulp & paper
12
Good Biomass Candidates Proximity to resource Demand for heat Sufficient space
13
Good PV Candidates Preferred installation area: flat or SW-SE facing, structurally sound, low-cost, minimal obstructions or shading If roof PV, where roof will not require replacement soon Where surcharges for peak electricity exist
14
Good Wind Candidates 24/7 operations >1000ft from nearest residence Class 3 or better wind (6.5m/s at hub height) On hill tops Away from trees, airports, and sandy soil
15
Fresh Hair - Solar Thermal Full service beauty salon Considered PV, but too expensive Projected 8yr payback $9,400 50-60MBtu/yr project, ~3/4 of need Tax incentives pay 40%, no grant money Pro: Investment in company and environment Con: Water out for 1-2 days during installation and a couple hours during annual maintenance
16
Harbec Plastics - Wind Injection molder Considered solar, but better wind resource Projected 8-9yr payback $375K 250kW project, no grants or tax benefits Pro: Everyone knows Harbec is environmentally responsible even if they don’t know what Harbec does Con: Took 13 months to get planning board approval
17
Bixby - PV Plastic sheet extruder Considered wind, but initial investment too high Projected 6-7yr payback $345K 51kW project, $257K in tax incentives and state grants Pro: A lot of publicity Con: Cloudier winter than expected
19
Things That Renewables Owners Would Change Location Equipment Type Efficiency Manufacturer Sooner!
20
Other Items That May Concern You #1 complaint was that the process took longer than expected Except for Fresh Hair, renewables have been completely transparent to production operations Everyone said they’d do it again if they had it to do over
21
Note to Assistance Providers… Many companies pursued on-site renewables as a result of direct outreach! Fresh Hair Bixby Cordis Varian Semiconductor
22
Questions??
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.