Driving Status of N*Grid Project in Korea August 27, 2003 Jongsuk Ruth Lee KISTI Supercomputing Center
2
Table of Contents Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project Implementation of Grid Testbed Development of Grid System Research on Grid Applications Strategy for N*Grid Project Milestones Summary
3
Definition of Grid
4
Research Infrastructure for dynamically collecting & integrated sharing Research Resources connected by high-speed network Large Scale Data Scientific Research Instrument Experts Problem Solving GRID Supercomputer
5
Status of Resources & Grid Necessity
6
Status of Research Resources (1/2) Status of Supercomputer usage ( KSCA, 2003. 3) Organization Utilization KISTI 80% KMA 80% SNU 70% DIU 30% CNU 40% POSTECH 60% PNU 70% K-JIST 60% NameOrganization High Voltage Transmission Electron MicroscopyKBSI NMR SpectroscopyKBSI Hanbit Plasma EquipmentKBSI Electron Linear AcceleratorPOSTECH Research Reactor HanaroKAERI Wind tunnelKARI Flight SimulatorKARI Status of the only Research Instruments Holding
7
Status of Research Resources (2/2) Status of Research Networks Domestic KOREN : 30Gbps/1GbPS KREONET2 : 10Gbps/1Gbps International APII Testbed (Korea – Japan) : 1Gbps etc TEIN : ~ 30Mbps STAR TAP LINK : ~155Mbps Campus/Industry Network : Gbps
8
Necessity of Introducing Grid (1/2) Demand of Domestic Computing Resources 0 20 40 60 80 100 120 140 160 1996199719981999200020012002 Rmax(TFlops) USAKOREADomestic Demand 148.7 12.4 2.6
9
Necessity of Introducing Grid (2/2) Necessity of Research Infrastructure Implementation Necessity of investing fund to implement Grid infrastructure for 6T researches to access any computing resources and data any time and any where * Status of 6T Research Fund ( IT News : 23. 7. 2002) AreasIT Research Fund 1241.7 billion BT 374.2 billion ET 219.3 billion ST 157.2 billion NT 81.9 billion CT 32.3 billion Total 2106.5 billion
10
N*Grid Project
11
11 N*Grid includes National Computational Grid National Data Grid National Access Grid National Application Grid (Ex: Bio Grid, CFD Grid, Meteo Grid etc) including application testbed and portals N*Grid is planned at the government level by MIC(Ministry of Information and Communication) 5 year project (2002-2006) Total budget : ~ 32M USD N*Grid Project (1/6)
12
History of N*Grid with KISTI 1998-1999: Preceding research Development of metacomputing technology on heterogeneous supercomputing resources(The result is published at PDPTA2000 conference) Development of a portable computational steering package: CSP 2000: Initiation of Globus-related research and activity Building of Globus-based metacomputing test-bed Satoshi Sekiguchi(TACC, Japan) proposed Korea to join APGrid(Jun., Dec.) 2001: N*Grid start KISTI Supercomputing Center suggest at MIC to carry out N*Grid(Feb.) MIC announced to start N*Grid as a 5 year(2002-2006) national project(May.) Korea Gird Forum will be launched in Oct., 2001. N*Grid Project (2/6)
13
Major Contents of N*Grid (2002-2006) Building and operation of Grid Network (using KOREN, APII Testbed, KREONet2, HPCNet, etc.) Grid application project survey and support (Bio, CFD, Meteo, etc.) Grid related R&D and standardization (Grid middleware & Grid browser, etc.) Promotion for sharing of high performance computers and large-scaled research instruments (Supercomputer, Storage, etc.) Construction of Grid Forum Korea (Include gov., univ., research inst., etc.) N*Grid Project (3/6)
14
14 Grid Middleware Internet 1 & 2 High Speed Network/ATM Supercomputers Large capacity Storages Research Instruments Creative Experts GRID Project Survey & Support (NGI Killer Appl.) Increase Research Power for fundamental Science and Industry Application → Activation of NGI Business Application Leap for World Top 5 Country in Knowledge Infrastructure (Enhancement of National Competitiveness) Execution of Grid Application Project Emerging Industry: IT, BT, NT, ET, etc. Industry: Semiconductor, Car, Steel, Machinery, etc. N*Grid N*Grid Project (4/6)
15
N*Grid Project (5/6) KISTI is the leading edge institution Selected research partners from academia, industry, and government lab through a public competition 13 partners in constructing Grid infrastructure (e.g., Construction of national supercomputer Grid) 8 partners in Grid middleware researches (e.g., Grid technology for high-end Grid environment) 10 partners in Grid applications R&D (e.g., Virtual Wind Tunnel using Grid) 2 partners in Grid standardization of Grid middleware technology (e.g., GridIR WG, DAIS WG)
16
N*Grid Project (6/6) GFK (Grid Forum Korea) The Grid organization in Korea (878 members from 254 organizations & 25 WGs as of Aug. 2003) Its support is included in the N*Grid project GFK 2002 Summer Workshop (July 11-12, 2002, 280 participants) GFK 2002 Winter Workshop (Dec. 10-11, 2002, 200 participants) GFK 2003 Summer Workshop (Aug. 19-21, 2003, 220 participants) Working Groups Application Area : 10 WGs Middleware Area : 6 WGs Network Area : 2 WGs Etc.: 7 WGs Participating Individuals Government Institution :41 University : 95 Research Institute : 475 Industry : 267
17
Plans for Activating N*Grid
18
Plans – Implementation of Grid Testbed (1/2) Implementation of Computing Grid Testbed Public supercomputer: 8 HPC PC Cluster: 8 KMA KOREN, APII, TEIN, STARTAP KREONET2, HPCNET KAIST POSTECH KISTI CNU KJIST DIU SNU KIAS SAIT KIST KISTI UOS PNU Supercomputer Cluster
19
CNU SAIT Plans – Implementation of Grid Testbed (2/2) Implementation of Access Grid Testbed Large Scale Storage: 8 VR System: 3 Access Grid System: 3 KOREN, APII, TEIN, STARTAP KREONET2, HPCNET Grid Middleware SNU KMA KISTI EVL KISTI KJIST KNU PNU KMA KRIBB KIST NCSA KISTI Storage VR System Access Grid System
20
Plans – Development of Grid System (1/4) Development of N*Grid Portal System Providing Grid log-in, distributed file transfer, collection and integration of results, monitoring of Grid resources & jobs, etc
21
Plans – Development of Grid System (2/4) Development of Grid Advanced Information Service System Providing the integration function of multiple resources query interfaces, dynamic state information, dynamic virtual organization information, etc
22
Plans – Development of Grid System (3/4) Development of MoreDream Resource Management Supporting the functions of the Resource discovery, co-allocation, job submission, job monitoring, etc.
23
Plans – Development of Grid System(4/4) Development of N*Grid CA System Supporting the functions of the Web-interface, PKI, key automatic generation/management/search, etc.
24
Plans – Research on Grid Applications Application Researches on IT+IT, IT+BT, IT+NT, … based on Grid Applications for the large-volume and repeated computation Applications for massively parallel environment which are can divided and analyzed Bio, new drug, ST, NT, ET, Computer Graphic (Rendering), etc. Construction of bio-informatics portal grid Computational chemistry and Nano materials Molecule simulation of Bio/Nano materials Electronic structure computational Grid Nano materials computational Grid Comprehensive environmental flow model Large-scale finite element analysis technique on GRID environment Design shape optimization technology using virtual wind tunnel based on Grid Realization of virtual design & development Grid system Heat exchanger design under the Grid environment Examples
25
Plans – Implementation of Grid NOC Construction of Logical Grid Network and Technical Support using National & International Network A : Requirement of common use of national/international R&D network / Support of scientific technology application resources B : Requirement of scientific technology application resources / support & sharing of R&D network resources C: Control of user connection (providing connection channel between domestic R&D network) MIC Supercomputer/Cluster, Visualization System (SeeMore) Science Technology Information DB User Group Resources Establish Policies Implementation & Operation GRID Forum - Korea-Japan, Korea- Singapore Link - Korea-USA Link(via Japan) - National Size (Backbone over 15 areas) - Joining Institute: about 300 R&D Institutes - R&D Exclusive Korea-Japan and Korea-USA Links - Backbone over 5 areas - Joining Institute: 32 R&D Institutes KREONet/HPCNet/KREONet2 KORENAPII-Testbed - Bandwidth Allocation - User Connecting Control/Management - Network Facility Management/Operation - Network Security/Engineering GRID-NOC Interconnection BA A B User Group Domestic R&D Research Network CC
26
Plans – Strategy for N*Grid Project (1/2) Phased implementation of N*Grid infrastructure Exhibitory implementation from computing Grid Phased plans Year 2002-2004 Implementation of Computing Grid Implementation of Grid mobile access environment Research on exhibitory applications Year 2005-2006 Implementation of Data Grid Implementation of Virtual Realization Grid Research on specific applications Year 2007-2011 Implementation of scientific research equipment Grid Implementation of open Grid
27
Virtual wind tunnel equipment Integration of Data Grid Integration of Access Grid Supporting mobile Grid III (2007-2011) Electron liner accelerator DB centric Virtual realization system centric Including medium and small size computer II (2005-2006) Electron microscopyStorage centric Access Grid system centric Medium and large size computing centric I (2002-2004) Scientific Research Equipment Grid Data GridAccess GridComputing GridPhase Phase III (2007-2011) Phase II (2005-2006) Phase I (2002-2004) Computing Grid Access Grid Data Grid Access Grid Computing Grid Scientific Research Equipment Grid Computing Grid Access Grid Data Grid Plans – Strategy for N*Grid Project (2/2)
28
Plans – Milestones Main Contents Phase 1 2002 - 2004 Phase 2 2005 - 2006 Phase 3 2007 - 2011 - Computing Grid Testbed. Medium and large size computer centric. Medium and small size computer inclusion. Supporting mobile Grid - Latest Access Grid Testbed. VR Grid. Access Grid. Data Grid - Scientific Research Equipment Grid Testbed. Electron microscopy. Liner accelerator. Virtual wind tunnel equipment Testbed - Research on Grid Applications. Research on exhibitory applications. Research on specific applications - Development of Grid System. Grid Portal. GNOC system. Collaborative VR System. Mobile Grid Access System Applications and System Development
29
Summary The goal of the N*Grid project is to build a national Grid infra as a high performance research cyber infra. The N*Grid project is to enhance research productivity in the fields of science and technology. The future direction of N*Grid project will be emphasized on the activation of Grid technology research - by participating in GGF WG/RGs for the international Grid technology standardization, - by implementing international standard Grid testbeds, and - by developing of Grid Middleware and applications.
30
Thank you for your kind attention. For more information, http://www.gridforumkorea.org