M1H Transfer Function Georg Gassner, March 6 th, 2013
2
2 Measurement Setup LCLS-II Phys. Meeting / March 6, 2013 Seismometer Vibco Buttkicker
3
3 M1H Background Noise – X-Axis LCLS-II Phys. Meeting / March 6, 2013
4
4 M1H Background Noise – Y-Axis LCLS-II Phys. Meeting / March 6, 2013
5
5 Vibrating the Stand LCLS-II Phys. Meeting / March 6, 2013 Buttkicker 43.6Hz
6
6 Applied Freq. vs. X-Axis Sensor on Top LCLS-II Phys. Meeting / March 6, 2013 31nm Amplitude 3nm Amplitude 3µm Amplitude
7
7 Applied Freq. vs. Y-Axis Sensor on Top LCLS-II Phys. Meeting / March 6, 2013 Y- motion mostly caused by crosstalk due to sensor placement off axis 3nm Amplitude
8
8 Vibrating the Floor LCLS-II Phys. Meeting / March 6, 2013 Vibco
9
9 Applied Freq. vs. X-Axis Sensors LCLS-II Phys. Meeting / March 6, 2013 31nm Amplitude3nm Amplitude
10
10 Applied Freq. vs. Y-Axis Sensors LCLS-II Phys. Meeting / March 6, 2013 3nm Amplitude
11
11 Result - Transfer Function LCLS-II Phys. Meeting / March 6, 2013 -Y-axis vibration 1=1 -X-axis response varies by the induced frequency.
12
12 Construction Activity test Aug 1 st 2012 LCLS-II Phys. Meeting / March 6, 2013 Road Header M1H top 1.0µm @ 24Hz (27; 29) M2H top 0.1µm @ 20Hz M1H floor 0.3µm @ <20Hz Integrated raw data: Statistics @ 23Hz
13
13 Construction Activity test Aug 1 st 2012 LCLS-II Phys. Meeting / March 6, 2013 Concrete Drill M1H top 0.1µm @ 30Hz (24; 45) Integrated raw data: Statistics @ 30Hz
14
14 Outlook LCLS-II Phys. Meeting / March 6, 2013 Mirror yaw measurements: -No measurement device available to measure yaw movement with 1µrad resolution @100Hz sampling rate. -Solution: Use x-ray beam to measure effect of mirror vibration in FEH. -Install vibration device and seismometer sensors on PAMM of 3/20. Measure construction activity: -Installed sensors in BTH today. -Construction activities and vibration measurements on 3/19.
15
Construction Equipment Activities – Sensor Placement Slide 15 QT41, 42, 43 QUM1 &2 QEM1 & 2 Construction Activities
16
16 Sensors on QUM#1 & #2 and QEM#1 & #2 LCLS-II Phys. Meeting / March 6, 2013
17
17 Sensors on QT41, QT42 & QT43 LCLS-II Phys. Meeting / March 6, 2013