M1H Transfer Function Georg Gassner, March 6 th, 2013.

Similar presentations


Presentation on theme: "M1H Transfer Function Georg Gassner, March 6 th, 2013."— Presentation transcript:

1 M1H Transfer Function Georg Gassner, March 6 th, 2013

2 2 Measurement Setup LCLS-II Phys. Meeting / March 6, 2013 Seismometer Vibco Buttkicker

3 3 M1H Background Noise – X-Axis LCLS-II Phys. Meeting / March 6, 2013

4 4 M1H Background Noise – Y-Axis LCLS-II Phys. Meeting / March 6, 2013

5 5 Vibrating the Stand LCLS-II Phys. Meeting / March 6, 2013 Buttkicker 43.6Hz

6 6 Applied Freq. vs. X-Axis Sensor on Top LCLS-II Phys. Meeting / March 6, 2013 31nm Amplitude 3nm Amplitude 3µm Amplitude

7 7 Applied Freq. vs. Y-Axis Sensor on Top LCLS-II Phys. Meeting / March 6, 2013 Y- motion mostly caused by crosstalk due to sensor placement off axis 3nm Amplitude

8 8 Vibrating the Floor LCLS-II Phys. Meeting / March 6, 2013 Vibco

9 9 Applied Freq. vs. X-Axis Sensors LCLS-II Phys. Meeting / March 6, 2013 31nm Amplitude3nm Amplitude

10 10 Applied Freq. vs. Y-Axis Sensors LCLS-II Phys. Meeting / March 6, 2013 3nm Amplitude

11 11 Result - Transfer Function LCLS-II Phys. Meeting / March 6, 2013 -Y-axis vibration 1=1 -X-axis response varies by the induced frequency.

12 12 Construction Activity test Aug 1 st 2012 LCLS-II Phys. Meeting / March 6, 2013 Road Header M1H top 1.0µm @ 24Hz (27; 29) M2H top 0.1µm @ 20Hz M1H floor 0.3µm @ <20Hz Integrated raw data: Statistics @ 23Hz

13 13 Construction Activity test Aug 1 st 2012 LCLS-II Phys. Meeting / March 6, 2013 Concrete Drill M1H top 0.1µm @ 30Hz (24; 45) Integrated raw data: Statistics @ 30Hz

14 14 Outlook LCLS-II Phys. Meeting / March 6, 2013 Mirror yaw measurements: -No measurement device available to measure yaw movement with 1µrad resolution @100Hz sampling rate. -Solution: Use x-ray beam to measure effect of mirror vibration in FEH. -Install vibration device and seismometer sensors on PAMM of 3/20. Measure construction activity: -Installed sensors in BTH today. -Construction activities and vibration measurements on 3/19.

15 Construction Equipment Activities – Sensor Placement Slide 15 QT41, 42, 43 QUM1 &2 QEM1 & 2 Construction Activities

16 16 Sensors on QUM#1 & #2 and QEM#1 & #2 LCLS-II Phys. Meeting / March 6, 2013

17 17 Sensors on QT41, QT42 & QT43 LCLS-II Phys. Meeting / March 6, 2013