Download presentation
Presentation is loading. Please wait.
Published byJulie Freeman Modified over 9 years ago
1
E.C. Aschenauer RSC-Meeting, January 21st 2011 1 T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e f o u n d o n w i k i l e a k s
2
RHIC pC Setup Run11 E.C. Aschenauer RSC-Meeting, January 21st 2011 2
3
Polarimeter Status Work during access on Wednesday: fixed problem with readout of yellow-1-downstream polarimeter investigated problem with current monitoring of Y2U spares of modules involved located can hopefully fix the problem at the next access day E.C. Aschenauer RSC-Meeting, January 21st 2011 3 Hardware status okay Change in operational procedure: turn off Si bias voltage during beam studies, tune-up, APEX keep radiation damage at a minimum 111 bunch injection studies
4
First Data from B1 & B2 Polarimeters E.C. Aschenauer RSC-Meeting, January 21st 2011 4 Blue-1 Upstream Blue-2 Downstream Raw Data: bananas clearly visible calibration ADC -> energy alpha calibrations need to correct for Si – dead layer
5
-Calibration E.C. Aschenauer RSC-Meeting, January 21st 2011 5 Blue-1 Upstream Blue-2 Downstream factor 2 in position comes from the fact that downstream polarimeters don’t use shapers, which also amplify Remember ’s penetrate factor 10 deeper into Si than carbons Plan for upcoming shutdown: install 2 nd source Gd with different - energy install different foils to attenuate – energy (tests in lab planned)
6
Blue-1 Upstream Blue-2 Downstream Blue-1 Upstream Blue-2 Downstream RSC-Meeting, January 21st 2011 6 Data after Corrections E.C. Aschenauer t0t0 Energy-Scale Current Puzzle: difference between t0 and energy scale correction factor energy-scale correction based on Si dead layer
7
Data after all Corrections E.C. Aschenauer RSC-Meeting, January 21st 2011 7 Blue-1 Upstream Blue-2 Downstream After all corrections both polarimeters look very similar A r e y o u r e a d y ? ? ? ? F a s t e n y o u r s e a t b e l t s t h e s e c r e t w i l l b e r e v e a l e d
8
Polarization at Injection for Blue Ring E.C. Aschenauer RSC-Meeting, January 21st 2011 8 14807.003: blue1 upstream P = 51 +/- 3 % (stat only) 14807.212: blue2 downstream P = 49 +/- 3 % (stat only)
9
To Do Update parameters in online polarization calculation to get reasonable numbers Investigate the difference in energy-scale constant between B1 and B2 see we get the same result for Y1 and Y2 (just collected the data last night) measure linearity of energy response of different systems vary pulser amplitude latest during the next access day Need good data for Y1 and Y2 polarimeters to determine parameters for online, most likely the ones from last night will do. Analyze the polarization at flat top for B2 Next access-day fix bias voltage readout bring hopefully one detector back to live in Y2U by changing pre-amp box E.C. Aschenauer RSC-Meeting, January 21st 2011 9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.