Presentation is loading. Please wait.

Presentation is loading. Please wait.

Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.

Similar presentations


Presentation on theme: "Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007."— Presentation transcript:

1 Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007

2 Los Angeles County Metropolitan Transportation Authority (Metro) is.. the Regional Planner the Regional Builder the Regional Operator for the County’s 10 million people

3 Nation’s Second Largest Transportation System Average Daily Boardings (million) Metro Bus & Rail1.60 Municipal Partners & Metrolink Commuter Rail.40 Total LA County Transit System 2.00 Nation’s largest Clean-air fleet - >2,200 CNG buses 73 miles of Metro Rail – 63 stations 45 miles of Metro Transitways-26 stations 250 miles of Metro Rapid 425 HOV lane miles >730,000 people per day 250 miles of Metro funded Bikeways Metro Freeway Service & “Big Rig” Patrol service

4 The Challenge Strained Infrastructure Strained Financial Resources Air Quality and Greenhouse Gas Emissions Impacts of Trade Corridors: “America’s Loading Dock” 25 % Population and Employment growth Increasing Congestion (1/3 of the state total) Everywhere to everywhere travel pattern

5 … it’s only going to get worse Over the next 25 years… 2-3 million more people 1 million more jobs 30 % more trips More complex travel Highway Speeds less than 20 mph Reduced transit performance >200% growth in Cargo Traffic

6 Metro Strategic Direction Manage Existing System Maximize System Efficiency Increase System Capacity Manage Demand

7 Metro’s Long Range Transportation Plan More… Transit (Rail/Bus) Car Pool lanes Goods Movement Ridesharing Bicycle Facilities Pedestrian Linkages Transit-Oriented Development

8 Metro Rail & Transitway Network 2 subway lines -130,000 riders 3 light rail lines -135,000 riders 3 Transitways -50,000 riders 2 LRTs const. >70,000 riders est. Under Construction

9 Metro Orange Line -Multi-modal Innovation 1/3 of new riders were US-101 commuters 2020 ridership estimates surpassed in 2006

10 Metro Rapid- Innovation Seamless Rapid Red design Three station styles Low-floor easy boarding 40-64 seats Quieter CNG buses “Next-bus” display Bus Lanes

11 Metro Rapid-Build Upon Success

12 Los Angeles Bike-Transit Hub Network 1st Mile Challenge

13 Metro Car Pool Lanes NORTH LA COUNTY LOS ANGELES COUNTY HOV PROGRAM IMPLEMENTATION SCHEDULE (1999-2025) Opening Date of HOV Projects Existing 2001 - 2005 2006 - 2025 Freeway Strategic Plan Corridor Studies Produced by: Countywide Planning >730,000 people per day

14 AM Peak Period Speeds (in MPH) Freeway Arterial 2004No Build (2030) 2001 Constrained Plan (2030) 2001 Smart Growth/ Pricing Alternative (2025)

15 Setting the Framework for 2030 Meeting the travel needs of over 12 million people will require more than new infrastructure. It requires changes in travel behavior. Speed and Reliability could significantly improve and transit ridership would more than double if smart growth and pricing strategies are aggressively implemented.


Download ppt "Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007."

Similar presentations


Ads by Google