Download presentation
Presentation is loading. Please wait.
Published byBlake Hodge Modified over 9 years ago
1
EDF R&D WP2 : Energetic aspects of urban waste treatments Claire Lecointe, Charlotte Barbut 3 rd AWAST Workshop June 20-21 st, 2002, Trondheim
2
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES PLAN Introduction Inventory of energy data in waste management Incineration model Biogas energy recovery model Conclusion
3
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Introduction D3 : Comparable energetic data for the different channels and for the contractor countries D4 : Energetic models
4
EDF R&D Inventory of energy data
5
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Negative points : few data about energy consumption Transport : only available data are from the French Agency for the Environment and the Energy Control (ADEME) Composting : only available data are from LQARS. They are low according to some general values (16,3 kWh/t compared to 20 to 100 kWh/t) Sorting : no data
6
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Positive points : inventory of energy production Incineration : energy production and self-consumption reports easily available data like temperature, pressure… only available for some models of French installations with our own software Methanisation and landfill : energy production and self-consumption reports easily available But information differs a lot from country to country and is not complete for all countries
7
EDF R&D Incineration model
8
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Incineration flows with the model entries
9
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Strasbourg incineration plant results electricity yield = 5,1% thermal yield = 25,0% ex CM = LHV waste / [1 + air (1+ ) V A ] ex S = h - T ambiant c p ln(T S /T ambiant ) ex H2O = h - T ambiant s F = M S *ex S1 / [(M W +M A )*ex CM ] B = M H2O (ex H2O2 - ex H2O1 ) / [M S (ex S2 - ex S1 )] T = W e / [M H2O (ex H2O3 - ex H2O2 )] e = W e / [(M W +M A )*ex CM ] th = M H2O (ex H2O3 - ex H2O1 ) / [(M W +M A )ex CM ]
10
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Strasbourg incineration plant results electricity yield = 5,1% thermal yield = 25,0%
11
EDF R&D Biogas energy recovery model
12
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES The different ways of biogas energy recovery
13
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Energy recovery with biogas engine exergy = thermal + physical exergy electricity production linked to mechanical energy provided by the piston mechanical energy provided during compression, expansion and combustion for a diesel engine study of thermal exergy similar to the incineration case
14
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Conclusion Delay for both deliverables Incineration model : OK Biogas energy recovery model : at the moment the only available data for biogas engine are theoretical Problem with biogas production model for methanisation and landfill Participation in Orleans Case Study Greenhouse gases study
15
ECO-EFFICIENCY AND INDUSTRIAL PROCESSES Financial statements most of the cost is personal cost Personal hours on project ContractStatement 2001500930 2002850~ 1700 20031000?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.