Presentation is loading. Please wait.

Presentation is loading. Please wait.

Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit.

Similar presentations


Presentation on theme: "Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit."— Presentation transcript:

1

2 Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit Development of temperature maintainer for digester Development of economical and portable filling station

3 By developing the project provide local fuel generation ability Provide energy secure feature to country Output of biogas plant is Nitrogen enrich slurry which can be used as a fertilizer in farm due to this less pollution of fertilize land and reduction in chemical fertilizer use and import Provide solution to manage the waste This Biomethene can be directly injected to the Natural gas grid which give support to CNG grid capacity


Download ppt "Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit."

Similar presentations


Ads by Google