NSTX 5 year plan – J. Menard and M. Ono 1 Schedule for development FY09-13 NSTX 5 Year Plan April 2007Draft plan for key approaches in support of opportunities April 2007Develop and review outline for the draft plan April 2007Team meeting to review approaches and opportunities We are at end of June we only have 1 working month to complete draft plan (EPS, Results Review, you might want to take some vacation in August…) July 2007Initial draft plan ready August 2007Team discussion of the initial draft plan Mid-Sept, 2007Tokamak Planning Workshop at MIT Oct. – Dec. 2007Improve the draft plan January 2008NSTX PAC reviews the draft plan February 2008Final draft plan ready for review by the team April 1, 2008Final plan (document) ready 3 wks before reviewDraft presentation material ready 2 wks before reviewDry run of the presentation 1 wk before reviewFinal presentation material ready ~ May 2008 (TBD)New 5 Year Plan Review meeting
2
NSTX 5 year plan – J. Menard and M. Ono 2 Proposed Five Year Plan Write-up Responsibilities do we want to change anything? (last chance…) *Start-up is included in T&T and Integration Do we discuss NHTX at workshop or in 5 year plan text? LeadInputs Chapter 1Overview/IntroductionM. OnoJ. Menard, S. Kaye, M. Bell, M. Peng Chapter 2MHDS. SabbaghJ. Menard, D. Gates, J. Manickam Chapter 3T&TS. KayeM. Bell, K. Tritz, T.S. Hahm Chapter 4Waves & ParticlesG. TaylorJ. Hosea, C.K. Phillips, N. Gorelenkov, E. Fredrickson Chapter 5BoundaryR. MaingiH. Kugel, V. Soukhanovskii, R. Majeski, R. Kaita, C. Skinner, D. Stotler Chapter 6IntegrationJ. MenardC. Kessel, S. Kaye, D. Gates, R. Raman Chapter 7ST Development Path-CTFM. PengC. Neumeyer, J. Menard, S. Kaye Chapter 8Facility/Diagnostics/ControlM. BellM. Ono, R. Kaita, C. Neumeyer, B. Stratton, D. Gates AppendixNSTX Collaboration PlanM. PengCollaboration Leaders
3
NSTX 5 year plan – J. Menard and M. Ono 3 Draft agenda for NSTX, C-mod, and DIII-D National Tokamak Planning Workshop at MIT, September 17-19, 2007 Monday – September 17 10amOFES Perspective Overview of Facility Plans (30min presentation, 5min Q&A) 10:15 amC-Mod 5- year Plan Overview 10:50 amDIII-D 5 year Plan Overview 11:25 amNSTX 5-year Plan Overview 12:00 pmLunch Topical Area Coordination Discussions: Integrated Scenario Research 1:15 pmFacility plans (DIII-D, C-mod, NSTX) 2:15 pmSummary of preliminary coordination activities 2:30 pmDiscussion: Integrated Scenario Plans 4:30 pmBreak Research on Waves and Energetic Particles 4:45 pmFacility plans (DIII-D, C-mod, NSTX) 5:45 pmSummary of preliminary coordination activities 6:00 pmDiscussion: Research Plans for Waves & EP 7:45 pmAdjourn Tuesday – September 18 Macroscopic Plasma Physics Research 9:30 amFacility plans (DIII-D, C-mod, NSTX) 10:30 amSummary of preliminary coordination activities 10:45 amDiscussion: Macro Research Plans (break included) 12:15 pmLunch Multi-scale Transport Physics Research 1:15 pmFacility plans (DIII-D, C-mod, NSTX) 2:15 pmSummary of preliminary coordination activities 2:30 pmDiscussion: Transport Research Plans 4:15 pmBreak Research on Plasma Boundary Interfaces 4:30 pmFacility plans (DIII-D, C-mod, NSTX) 5:30 pmSummary of preliminary coordination activities 5:45 pmDiscussion: Boundary Research Plans 7:30 pmAdjourn Wednesday – September 19 Summary Reports of Coordination Discussions 9:30 amPlasma Boundary Interfaces 9:50 amWaves and Energetic Particles 10:10 amIntegrated Scenario Research 10:30 amBreak 10:45 amMacroscopic Plasma Physics Research 11:05 amMulti-scale Transport Physics Research 11:25 amAdjourn
4
NSTX 5 year plan – J. Menard and M. Ono 4 Preparation for workshop will be more efficient if we: Agree early (today?) on overall format and perspectives to carry forward into workshop and chapters Understand and incorporate any needed coordination and planning with DIII-D and C-MOD prior to the Sept. meeting Have good outlines and most of the chapter text ready Incorporate information from the results review Other? To be discussed…
5
NSTX 5 year plan – J. Menard and M. Ono 5 Agenda: Discuss how to frame/coordinate NSTX research plans The purpose of this meeting is not to discuss physics details. Obtain guidance and discuss how to best prepare and present the NSTX 5-year plan during the workshop –Masa, Rich, Rob describe process thus far, and their perspectives Discuss possible needed coordination and planning with DIII-D and C-MOD prior to the September meeting. –Discuss possible role of BPO in this process – do we want this? Get brief update from lead authors on progress on writing chapters and preparation for workshop. –Get schedule of availability for writing from authors Any problems with getting drafts completed by early-mid August? –Authors should think about this before meeting Discuss near-term timeline and outlines for completing work for workshop and 5-year plan text
6
NSTX 5 year plan – J. Menard and M. Ono 6 Perspectives to include in plan chapters Importance of research to general toroidal plasma science Importance to burning plasma research = ITER –How ST research complements higher-A research Importance to ST-development = ST-CTF and NHTX –Startup and ramp-up, fully non-inductive steady-state, etc. Expect more emphasis on boundary physics in next 5 years –Important in its own right + NHTX relevance Make links to new diagnostic requirements/availability Emphasize implications of new facility capabilities: –Off-midplane RMP/RWM coils – ELM control, 3D edge, improved RWM control –Liquid lithium divertor – lower density, higher E, diagnostics, etc. –Sub-cooled TF and OH – Goal: 5.5kG, 1MA discharges for 2.5s –200-400kW ECH/EBW – more power (up to 1MW) if results are favorable –Second NBI box with larger R TAN injection (CD, TAE, diagnostics, etc) –Advanced fueling (pellets, CT injection) –Higher CHI voltage, plasma guns
7
NSTX 5 year plan – J. Menard and M. Ono 7 Some general guidelines for chapter writing Topical chapters of previous 5-yr plan were 30-35 pages –Aim for similar length for this 5 year plan See last plan for format/structure – but can we do better? Outline of topical chapters: –Overview of chapter – approx 1 page –Summarize recent results and new understanding, highlight diagnostics Focus on how results motivate new research in FY09-13 plan –State plans for each subtopic of your topical area – 1-2 pages Overall goal of subtopic research plan in 1 sentence Breakdown plan for subtopic in 1-2 year increments – physics, measurements, new capabilities, deliverables –Summary – 1 bullet/sentence for each subtopic –Graphical timeline of research plan – physics on top, tools on bottom Develop 8-12pg detailed outline of your chapter by July 11Develop 8-12pg detailed outline of your chapter by July 11