Download presentation
Presentation is loading. Please wait.
Published byRodney August Charles Modified over 9 years ago
1
BULLDAWG PROSPECT Liberty County, Texas
3
HOUSTON, Oct. 5, 2005 PRNewswire-First Call -- Carrizo Oil & Gas, Inc. (Nasdaq: CRZO) announced today that the Galloway #1 well in Liberty County, Texas has been successfully drilled and completed, and was put on line on September 30th. Logs indicated 64 feet of apparent net pay in the Cook Mountain sand. The Galloway #1 has tested at estimated rates of up to 13,100 MCF of natural gas and 320 barrels of oil (15,020 MCFE) per day with a flowing tubing pressure of 9,897 psi. The Galloway #1 is currently producing to sales at a constrained rate of approximately 10,100 MCF of natural gas and 240 barrels of oil (11,540 MCFE) per day. CRZO GALLOWAY #1
4
GALLOWAY #2 GALLOWAY #2 DENVER, July 25, 2006 /PRNewswire-FirstCall via COMTEX News Network/ -- Cimarex Energy Co. (NYSE: XEC) Galloway Gas Unit #2 (50% working interest) commenced production in July and is currently producing gas of 9.4 MMcf/d and oil of 1,200 barrels per day (16.6 MMcfe/d).
5
HOUSTON, May 18 PRNewswire-First Call/ -- Carrizo Oil & Gas, Inc. (Nasdaq: CRZO) In Liberty County, Texas, the Company-operated Doberman prospect is producing at 11.2 MMCFE/d from Yegua sands at 13,000 feet. Carrizo generated the prospect and has a 71 percent working interest. CRZO DOBERMAN PROJECT
6
IPF: 9287 MCFPD; 188.4 BOPD Avg. Daily Prod: 8219 MCFPD; 166 BOPD Max avg. for a month: 10,424 MCFPD; 217 BOPD Current Cum: 180,384 BO; 8.8 BCF ROI To Date 400% + tax benefits
7
BULLDOG-1 X = 3767733 Y = 131078 350’ RADIUS +/- 14,790’ 32 ACRES BULLDOG-2 X = 3769363 Y = 132132 350’ RADIUS +/- 14,715’ 42 ACRES UPPER and LOWER NOD MEX Cumulative (since 1970) 356 MMCF; 19,841 BO Cumulative (since 1970) 134,986 BO; 1,317 MMCF Cumulative (since 1970) 1,156 MMCF; 21,103 BO Cumulative (since 1970) 968 MMCF; 22,069 BO Cumulative (since 1970) 3,997 MMCF; 73,967 BO CHOICE – BULLDOG SHALLOW (lower section) NOD-MEX PACKAGE CARRIZO – DOBERMAN SHALLOW NOD-MEX PACKAGE X = 3769363 Y = 132323 350’ RADIUS 14,140’ +/- 95 ACRE (MAX) UPPER NOD LOWER NOD
8
FORMATION STRUCTURE Upper NOD MEX Bulldawg Location A 95 acres Upper NOD MEX Bulldawg Location A 95 acres Upper NOD MEX 13,484’ Log Show CRZO 1Galloway 1GU- 1 Upper NOD MEX 13,484’ Log Show CRZO 1Galloway 1GU- 1 Upper NOD MEX CRZO 1-Doberman GU Production since 5/07 = 8.5 BCF + 175,000 Barrels 100 Acres Estimated Recovery = 16 BCF + 340,000 Barrels Upper NOD MEX CRZO 1-Doberman GU Production since 5/07 = 8.5 BCF + 175,000 Barrels 100 Acres Estimated Recovery = 16 BCF + 340,000 Barrels Lower NOD MEX Field Pay Sand CRZO 1Galloway GU-2 23 acres Produced: 1.1 BCF & 21,100 Barrels Lower NOD MEX Field Pay Sand CRZO 1Galloway GU-2 23 acres Produced: 1.1 BCF & 21,100 Barrels Lower NOD MEX Field Pay Sand CRZO 1Galloway GU-1 60 acres Produced 4 BCF + 74,000 Barrels Lower NOD MEX Field Pay Sand CRZO 1Galloway GU-1 60 acres Produced 4 BCF + 74,000 Barrels Lower NOD MEX Field Pay Sand Bulldawg Location A 32 acres Lower NOD MEX Field Pay Sand Bulldawg Location A 32 acres Lower NOD MEX Field Pay Sand Bulldawg Location B 42 acres Lower NOD MEX Field Pay Sand Bulldawg Location B 42 acres Lower NOD MEX Field Pay Sand XEC 1Galloway GU-1 29 acres Produced 1.6 BCF +165,000 Barrels Lower NOD MEX Field Pay Sand XEC 1Galloway GU-1 29 acres Produced 1.6 BCF +165,000 Barrels
9
Bulldawg Surface Location Bulldawg Surface Location Trinity River Upper NOD MEX Location A: 95 acres Upper NOD MEX Location A: 95 acres Upper NOD MEX CRZO 1-Doberman GU Production since 5/07 = 8.5 BCF + 175,000 Barrels 100 Acres @ 8.5 MMCFD & 150 BOPD Estimated Recovery = 16 BCF + 340,000 Barrels Upper NOD MEX CRZO 1-Doberman GU Production since 5/07 = 8.5 BCF + 175,000 Barrels 100 Acres @ 8.5 MMCFD & 150 BOPD Estimated Recovery = 16 BCF + 340,000 Barrels Lower NOD MEX - Field Pay Location B : 42 acres Lower NOD MEX - Field Pay Location B : 42 acres Lower NOD MEX - Field Pay Location A: 32 acres Lower NOD MEX - Field Pay Location A: 32 acres Lower NOD MEX - Field Pay XEC 1-Grammier 20 acres.51 BCF & 21,100 barrels Lower NOD MEX - Field Pay XEC 1-Grammier 20 acres.51 BCF & 21,100 barrels
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.