Presentation is loading. Please wait.

Presentation is loading. Please wait.

FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild.

Similar presentations


Presentation on theme: "FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild."— Presentation transcript:

1 FORTIFY……… ……………..I-40 / I-440 NC DOT Project

2 August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild project renamed “Fortify” by NC DOT November 2013 Night-Time Construction Begins December 2013 Day-Time Construction Begins

3

4 I‐40 FREEVAL Analysis Route for this Project (MP 312 through 284) 7 284 312 FREEVAL Results 4

5 AM Peak Travel Time Estimate ‐ I‐40 Westbound Estimated Benefits of Traffic Diversion for Trip from MP312‐MP284 FREEVAL Results No Diversion 20% Diversion 8 T r a v e l Time (Minu t es) Reduced to Two LanesReduced to Three Lanes 140 120 100 80 60 40 20 0 20 mph line (83 minute Travel Time) 40 mph line (42 minute Travel Time) Free Flow Travel Time (24 minute Travel Time) 100% Base 100%95%90%80%70%60%50% Percent of Traffic Remaining on the Facility

6 PM Peak Travel Time Estimate ‐ I‐40 Eastbound Estimated Benefits of Traffic Diversion for Trip from MP284‐MP312 No Diversion 20% Diversion 11 FREEVAL Results 350 300 250 200 150 100 50 0 50%60%70% 40 mph line (41 minute Travel Time) 100%95%90%80% 100% Base T r a v e l TIme Minu t e s (minI) Percent of Traffic Remaining on the Facility Reduce to Two LanesReduce to Three Lanes 10 mph line (165 minute Travel Time) 20 mph line (82.5 minute Travel Time)

7 AM Peak – Three‐Lane Pattern 18 Estimated Travel Time Impact on Other Routes DTALite Results Results include Triangle Expressway Toll Road 7 RouteRouteFromToToEB/NBWB/SB I‐44040/440 SplitWade Ave. 13.5 ‐> 14.8 min.24.7 ‐> 18.7 min. I‐540I‐40US64 23.7 ‐> 23.8 min.28.2 ‐> 30.3 min. Wade AvenueI‐440I‐40 2.7 ‐> 2.9 min.2.7 ‐> 2.7 min. US70White OakI‐40 10.4 ‐> 15 min.7.8 ‐> 8 min. US64NC55US1 7.1 ‐> 4.7 min.4.8 ‐> 5.1 min. US1US64Wade Ave. 17.4 ‐> 10.2 min.7.9 ‐> 8.4 min. NC50NC210US70 25.5 ‐> 21.2 min.14.9 ‐> 15.1 min. NC55I‐40US64 12.1 ‐> 14.1 min.13.6 ‐> 13.5 min. Hammond RoadUS70MLK Blvd. 9.1 ‐> 14 min.4.6 ‐> 5.6 min. Tryon RoadUS70US1 18.6 ‐> 16.6 min.15.9 ‐> 17.3 min. Rock Quarry RoadJones SausageMLK Blvd. 5.8 ‐> 5.9 min.7.2 ‐> 9.5 min. Ten‐Ten RoadUS401US1 16.7 ‐> 10.8 min.25.2 ‐> 21.8 min. Timber DriveNC50US70 6.1 ‐> 6.1 min.4.9 ‐> 4.7 min. Davis DriveI‐40US64 24.5 ‐> 14.9 min.16.3 ‐> 14.1 min.

8 PM Peak – Three‐Lane Pattern 20 Estimated Travel Time Impact on Other Routes DTALite Results Results include Triangle Expressway Toll Road 20 RouteRouteFromToToEB/NBWB/SB I‐44040/440 SplitWade Ave. 13.8 ‐> 16.2 min.18.8 ‐> 17.3 min. I‐540I‐40US64 32.6 ‐> 35.6 min.28.2 ‐> 25 min. Wade AvenueI‐440I‐40 3.9 ‐> 4.7 min.2.7 ‐> 3.3 min. US70White OakI‐40 16.7 ‐> 10.8 min.14.6 ‐> 10.6 min. US64NC55US1 4.6 ‐> 4.8 min.4.7 ‐> 6.2 min. US1US64Wade Ave. 18.9 ‐> 10.7 min.8.5 ‐> 9.2 min. NC50NC210US70 20.1 ‐> 17.6 min.19.2 ‐> 17 min. NC55I‐40US64 12.6 ‐> 14.4 min.18 ‐> 17.6 min. Hammond RoadUS70MLK Blvd. 8.2 ‐> 7 min.12.5 ‐> 7.3 min. Tryon RoadUS70US1 65.8 ‐> 32 min.40 ‐> 25.4 min. Rock Quarry RoadJones SausageMLK Blvd. 6.7 ‐> 7.2 min.7.4 ‐> 6.4 min. Ten‐Ten RoadUS401US1 41.6 ‐> 28.1 min.17.9 ‐> 13.5 min. Timber DriveNC50US70 6.2 ‐> 5.8 min.5 ‐> 5 min. Davis DriveI‐40US64 18.5 ‐> 16 min.17 ‐> 18.7 min.

9 AM Peak – Three‐Lane Pattern 22 Estimated Volume Difference on Other Routes DTALite Results Results include Triangle Expressway Toll Road 9 RouteRouteFromToToEB/NB (WZ‐BASE)WB/SB (WZ‐BASE) I‐44040/440 SplitWade Ave.‐196111 I‐540I‐40US64‐7‐118 Wade AvenueI‐440I‐40‐56601 US70White OakI‐40207285 US64NC55US1164682 US1US64Wade Ave.14648 NC50NC210US7061‐5 NC55I‐40US64968483 Hammond RoadUS70MLK Blvd.3316 Tryon RoadUS70US1‐30‐11 Rock Quarry RoadJones SausageMLK Blvd.80299 Ten‐Ten RoadUS401US1‐108106 Timber DriveNC50US70‐109‐132 Davis DriveI‐40US64‐1‐70

10 PM Peak – Three‐Lane Pattern 24 Estimated Volume Difference on Other Routes DTALite Results Results do not include Triangle Expressway Toll Road 10 RouteRouteFromToToEB/NB (WZ‐BASE)WB/SB (WZ‐BASE) I‐44040/440 SplitWade Ave.166‐458 I‐540I‐40US64‐105‐973 Wade AvenueI‐440I‐4027361 US70White OakI‐40784102 US64NC55US13571032 US1US64Wade Ave.12581013 NC50NC210US70‐66‐26 NC55I‐40US6411651473 Hammond RoadUS70MLK Blvd.‐40370 Tryon RoadUS70US1120117 Rock Quarry RoadJones SausageMLK Blvd.5‐23 Ten‐Ten RoadUS401US1‐4428 Timber DriveNC50US701446 Davis DriveI‐40US64‐14336

11 Summary of Interim Findings – AM Peak With three‐lane work zone pattern, 10‐20% diversion will keep average travel speed over 40mph With optimum diversion (equilibrium), network model estimates I‐40 westbound travel time to increase through work zone from 8.6 to 12.7 minutes for three‐lane pattern Model estimates 33% diversion for three‐lane pattern Model estimates volume increases over 500vph for Wade Avenue, US64, US1, and NC55 Diversion from I‐40 estimated to result in travel time increases over 30% for I‐440 EB, US70 northbound, Hammond Rd. northbound, and Rock Quarry Road westbound 25

12 Summary of Interim Findings – PM Peak With three‐lane work zone pattern, 40mph average travel speed can be maintained with approximately 30‐40% diversion. With optimum diversion (equilibrium), network model estimates I‐40 eastbound travel time to increase through work zone from 8.6 to 13.9 minutes for three‐lane pattern Model estimates 36% diversion for three‐lane pattern Model estimates volume increases over 500vph for US70, and over 1,000 vph for US64, US1, and NC55 Diversion from I‐40 estimated to result in travel time increases over 30% for Wade Ave. EB and Davis Drive SB 26

13 WCPSS Impacts Employees Commuting Employees Driving for Work Yellow Bus Transportation Special Needs Contract Transportation Parents driving students to / from school Students driving to / from school CTE High School

14

15

16

17 SLT Dr. Merrill


Download ppt "FORTIFY……… ……………..I-40 / I-440 NC DOT Project. August 2012 New I-40/440 rebuild project dubbed 'Crawleigh' by NC DOT October 2013 New I-40/440 rebuild."

Similar presentations


Ads by Google