Download presentation
Presentation is loading. Please wait.
Published byLeon Moody Modified over 9 years ago
1
C. Loomis – Integration Status- October 31, 2001 - n° 1 Integration Status October 31, 2001 charles.loomis@cern.ch
2
C. Loomis – Integration Status- October 31, 2001 - n° 2 Monday’s Presentation u Attendance n Approx. 80 people in IT Auditorium n Approx. 25 people via VRVS u Comments n Generally positive comments (“presentation was definitely useful”) n Negative: long day, lots of material, not always well-focused To give site administrators an overview of the capabilities, installation, and configuration of EDG software for Testbed 1 and to introduce them to the available resources.
3
C. Loomis – Integration Status- October 31, 2001 - n° 3 Acknowledgements Antony WilsonAndrew McNabEric Fede Anders WaananenPietro MartucciFlavia Donno Marco SerraAlex MartinPiergiorgio Cerello Elisabetta RonchieriCharles LoomisAlessandro Cavalli Yannick PatoisJulian LinfordFranck Bonnassieux Andrea ParriniYannick LegreJean-Phillipe Baud Sophie NicoudNadia LajiliMaite Barroso Shahzad MuzaffarEric Van HerwijnenStefano Barale Daniele MuraFabio HernandezJim Amundson Many thanks for their hard work!
4
C. Loomis – Integration Status- October 31, 2001 - n° 4 Legal Issues u Copyright Statement: n Copyright © 2001 EU DataGrid – see http://www.edg.org/license.htmlhttp://www.edg.org/license.html u License n Need to put something at link for release. n Is a BSD-style license? True? u Licenses for external packages. n What packages can be used? (BYPASS?) Need policy stmt. (PTB,PMB) n Lack of statement may eventually compromise mission.
5
C. Loomis – Integration Status- October 31, 2001 - n° 5 EDG Usage Guidelines Site usage guidelines present logistical problem for EDG operation. u Have official translation from CERN translation service. n Need to “finalize” version before EDG release. n Sit down with a few people to incorporate comments. n Need “official” location for document like license.
6
C. Loomis – Integration Status- October 31, 2001 - n° 6 (Frascati) Schedule u October 22 n First beta release of DataGrid (CERN & Lyon) u November 15 n Initial limited application testing finished. n EDG software ready for deployment on partner sites. u November 30 n Widespread deployment. n ITeam machines form development grid. n Testbed 1 open to all applications. u December 25 n Testbed 1 finished. Site schedule to take into account application priorities. Cannot include US sites until acceptable US CA exists.
7
C. Loomis – Integration Status- October 31, 2001 - n° 7 Middleware Status u WP1 n RB, JSS, II, UI (being ported to Globus2) u WP2 n RC API, GDMP (tested with Globus2) n SpitFire (tested) u WP3 n Schema MDS/FTree (testing, what tests needed in TB1?) n R-GMA n GRM/PROVE
8
C. Loomis – Integration Status- October 31, 2001 - n° 8 Middleware Status u WP4 n Installation/Configuration Tools (tested) n Image Installation (testing) n Information Providers PBS, LSF (testing) u WP7 n Network monitoring (delivered)
9
C. Loomis – Integration Status- October 31, 2001 - n° 9 Globus Status u Many EDG releases lately n Alpha9-Alpha12 n Combination of Globus/EDG fixes. n Added Netlogger in latest release. n See severe problems with Globus IO in latest versions. u Aside from problems: n JobManager works with PBS, LSF. n FTree works with information providers (Info. Providers being debugged) n MDS configured. n Job submissions between CERN & Lyon.
10
C. Loomis – Integration Status- October 31, 2001 - n° 10 Immediate Plans u Get minimally functional Globus2 distribution. u Incorporate WP1 tools. u Get authorization scheme in place (grid mapfile) u Develop test suite. u Develop documentation n User’s Guide n Installation Guide n Developer’s Guide u Setup CERN machines with PBS, LSF “sites”, with MDS hierarchy. u Let “loose cannons” onto DataGrid. u...
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.