Download presentation
Presentation is loading. Please wait.
1
Gdańsk Container Terminal Co
Established in 1998
3
Our motto GTK is…
5
Major advantages: customer’s approach,
professional and comprehensive services including terminal, depot and repair services. high quality standards. good connections to hinterland excellent transit connection to Russia, Belarus, Ukraine, Slovakia and Czech Republic
7
Location: Port of Gdańsk
9
Szczecińskie Quay
11
Technical facilities:
quay length 367 m ship length up to 205 m max. draft 9.8 m open stores 67 417 m2 reefer plugs – 95 units ships operated in lo-lo systems full support for railway wagons.
13
Technical facilities:
Ship-to-shore gantry crane- 40 / 60 t Shore cranes- 40 t Gantry cranes- 32 / 40 t Straddle carrier- 40 t Reach-stackers- 10 t Mobile harbor crane- 100 t 95 stations for refrigerated containers
15
Range of services: loading / unloading,
all kind of container handling services, stuffing, stripping, sampling, tallying, shifting ect. depot services (storage, repairs, washing, cleaning), goods storage on the yard, goods storage in the warehouse, consulting services assistance in contacts with administration Autorities and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection)
16
Specjalizacja: Nietypowe formowanie i rozformowywanie kontenerów
Ładunki sypkie Sztuki ciężkie Drobnica 16
17
Ładunki sypkie: 17
18
Sztuki ciężkie: 18
19
Drobnica: 19
21
GTK Co. Strengths: strong bussines relations with our customers,
experienced personnel with deep knowledge of the market and the core of business, wide range of services (container terminal, containers’ repairs, container depot, containers’ stuffing & stripping services), friendly IT software - SOTeK, possibility of an automatic access and transfer the system data based on EDIFACT standard, good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal.
23
Railway Companies providing services to GTK Co.:
PKP Cargo Spedcont Prokont Polzug Cargosped PCC Intermodal
25
CONTAINER FEEDER SERVICES
UNIFEEDER (calling twice a week ): Gdynia- Gdańsk (GTK)- Rotterdam Gdynia- Gdańsk (GTK)- Szczecin - Bremerhaven- Hamburg CMA - CGM (calling once a week ): Hamburg- Gdańsk (GTK)- Kaliningrad - Tallin- Hamburg ROTTERDAM BREMERHAVEN HAMBURG Tallin Kaliningrad PORT OF GDAŃSK Szczecin
28
Major shipping lines handled at GTK:
Hanjin Evergreen Hapag Lloyd APL CMA-CGM Cosco UASC MOL Hamburg SÜd ZIM CSAV China Shipping Yang Ming EUCON NYK Line K-Line NORASIA ANL Hyundai OOCL DELTA DELMAS Delphis
30
Business Activity: Ship handling: 24 hours a day, 7 days a week,
Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday.
32
Contact: Gdańsk Container Terminal Co.
Headquarter: Na Zaspę 3, Gdańsk, Poland Port Office:– ul. M. Chodackiego; Szczecińskie Quay NIP: KRS: ; Register Court in Gdańsk Initial capital: PLN ,00 Tel.: +(48) +(48) +(48) +(48) Fax: +(48) Office working hours: 8.00 a.m. to 4.00 p.m. from Monday to Friday
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.