Presentation is loading. Please wait.

Presentation is loading. Please wait.

CMS FRANCE MAI 2004 h.mathez 1 FIRST MGPA V2 TEST RESULTS with IPNL SETUP And MGPA V2 TEST PRODUCTION R. Della-Negra, M. Dupanloup, J. Fay, S. Gascon,

Similar presentations


Presentation on theme: "CMS FRANCE MAI 2004 h.mathez 1 FIRST MGPA V2 TEST RESULTS with IPNL SETUP And MGPA V2 TEST PRODUCTION R. Della-Negra, M. Dupanloup, J. Fay, S. Gascon,"— Presentation transcript:

1 CMS FRANCE MAI 2004 h.mathez 1 FIRST MGPA V2 TEST RESULTS with IPNL SETUP And MGPA V2 TEST PRODUCTION R. Della-Negra, M. Dupanloup, J. Fay, S. Gascon, H. El Mamouni, B. Ille, H. Mathez

2 CMS FRANCE MAI 2004 h.mathez 2 MGPA V2 TEST SETUP (0) MGPA V2 test board I2C Scope or CSA803 PC Labview PicoPulse Gen Trigger 3 Gains 50  input Bessel Filter 30 ns Data  40 V in 400 ps C inj = 1.0 pF Calibrated Differential to single ended 50  output

3 CMS FRANCE MAI 2004 h.mathez 3 MGPA V2 TEST SETUP (1) ARIES SOCKET

4 CMS FRANCE MAI 2004 h.mathez 4 Q=40pC, Gain X1 Rs1 = 3.3 Ohms Rs2 = 4.7 Ohms X1 Rs1 = 10 Ohms Rs2 = 10 Ohms FEW PLOTS (0)

5 CMS FRANCE MAI 2004 h.mathez 5 Qin = 4.5pC Rs1,2 = 10 Ohms After Reset, I2C = 64 Pkt X1  50ns Pkt X6  50ns Pkt X12  50ns Pkt PA  25ns X1 X6 X12 PA FEW PLOTS (1)

6 CMS FRANCE MAI 2004 h.mathez 6 X12 p X12 m PA Qin = 4.5pC Rs1,2 = 10 Ohms After Reset I2C = 64 X1 plus and minus output Base line are : 799.2 mV = 0.8 V (ADC input) 1488.8 mV < 1.7 V (ADC input) FEW PLOTS (2)

7 CMS FRANCE MAI 2004 h.mathez 7 X1 p X1 m PA FEW PLOTS (3) Qin = 40pC Rs1,2 = 10 Ohms After Reset I2C = 64 X1 plus and minus output Base line are : 670 mV < 0.8 V (ADC input) 1527 mV < 1.7 V (ADC input)

8 CMS FRANCE MAI 2004 h.mathez 8 FEW PLOTS (4) Peaking Time Gain X1 and X6

9 CMS FRANCE MAI 2004 h.mathez 9 FEW PLOTS (5) Power Supplies 573 mW

10 CMS FRANCE MAI 2004 h.mathez 10 PRELIMINARY YIELD Chips tested :133 Bad chips : 7 YIELD ~ 95%

11 CMS FRANCE MAI 2004 h.mathez 11 MECHANICAL PROBLEMS (0) Socket : with microstrip, same technology as previous (FPPA) package EDQUAD 52 pins ASAT New problems with Aries socket and ASAT TQFP100 package oThe socket was tested with Atlantic package at ARIES house : Some devices present an excess of plastic in the corners  Some small chips goes under the microstrip : no electrical contact, the MGPA does not work !  Microstrips could be twisted due to this small chips, the MGPA does not work ! NO problems Solutions  Very carefully clean up the PCB and the socket

12 CMS FRANCE MAI 2004 h.mathez 12 MECHANICAL PROBLEMS (1) Microstrip

13 CMS FRANCE MAI 2004 h.mathez 13 MGPA V2 TEST PRODUCTION

14 CMS FRANCE MAI 2004 h.mathez 14 MGPA V2 TESTING PRODUCTION REQUIREMENTS Start testing production : middle of September (if production starts on middle of june)

15 CMS FRANCE MAI 2004 h.mathez 15 TESTING HOUSES SUM UP (0)

16 CMS FRANCE MAI 2004 h.mathez 16 ASAT Europe business contact is currently overloaded Microtec and Edgetek appear to be very good candidates Strength Weakness Microtec Edgetek Experienced Already used inside CERN Flexibility ? IN2P3 partner for small quantities French company Flexibility for custom services Price Background for high volume production TESTING HOUSES SUM UP (1) We would suggest to give to Microtec the MGPA production tests

17 CMS FRANCE MAI 2004 h.mathez 17 TESTING CONCLUSION (MEETING 10 MAY CERN) Buffer Testing House : EDGETEK Forecast Schedule :  100 buffers for June 10 th  5000 buffers for July 15 th MGPA Microtec or Edgetek but we are waiting the Asat’s answer Edgetek seems to be the best way to test the MGPA Forecast Schedule :  1700 MGPA for july 15 th  Start testing production : middle of September


Download ppt "CMS FRANCE MAI 2004 h.mathez 1 FIRST MGPA V2 TEST RESULTS with IPNL SETUP And MGPA V2 TEST PRODUCTION R. Della-Negra, M. Dupanloup, J. Fay, S. Gascon,"

Similar presentations


Ads by Google