DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls
2
DFC 2
3
3 Outline EDMS Project follow up, Naming Projects –Timing, EPS, PSS, Fast interlocks –Vacuum, RF,IDs, Power Converters, Linac, Diagnostics, Motors Installation. Cabling Schedule
4
DFC 4 Project’s follow up
5
DFC 5 EDMS: Technical specs
6
DFC 6 Timing Communication of events. – Events are generated by: Internal counters (32 bit) External trigger signal or software. Optic event fiber: multimode 850 nm. 25 ps rms jitter in the output and one event ~280 Event receivers
7
DFC 7 Operators interfaces timing tests:
8
DFC 8 Fast interlocks and fast data loggers EVG Timing Fan Out EVRFIM-1 EVR FIM-1EVR FIM-1 FIM-2 General Interlock DetectionTTL In FIM-2 Patch Panel TTL Remote Interlock from Timing System 150m Optic Duplex Fiber FIM-1 Input Out put FIM -4 Input Outp ut FIM- 2 Input Outp ut Output Inp ut FIM-3
9
DFC 9 Equipment Protection System
10
DFC 10 Vacuum racks
11
DFC 11 PSS
12
DFC 12 Diagnostics BLM –Bergoz + Cosylab 485 CCD –Prosilica GigE –Frame grabber + Video Euresys + Jai Liberas –Server (soleil) –+ Python libraries
13
DFC 13 Ion Pumps –Varian double ? Penning & IMG –MKS ? Valves –Controlled by PLCs GUIs. See presentation by Vacuum Controls:
14
DFC 14 RF LAb 1 Transmitter 1 Cavity –Test of tunning of the plungger ADLINK DI/DO. –Test of Analog LLRF regulation ADLINK AI/AO –Test of Digital LLRF regulation. Sundance 1 PSS
15
DFC 15 IcePaP Microstepping (8A, 70V, 330W) Motion test bench Human interfaces Motion Configuration Icepapcms: Config tool for motors System/Crate level –Name of the driver –Status –Current… –Limit switches For each driver: –Enable/disable –Double click to configure it.
16
DFC 16 Power converters Digital regulation Ethernet connections Correctors and Fast Orbit Feed Back –Specification going on Linac ?
17
DFC 17 Beamlines
18
DFC 18 Installation: cable databases
19
DFC 19 Schedule RF, Vaccum protos, Diagnostics, etc.Linac 2007 PreinstallationCommissioning 2008 Installation ID inst. 2009 CommissioningID commissioning
20
DFC 20 Thank you for your attention P.Readman D.Beltran R.ButzbachE.TaurelD.Fernández F.Becheri R.Ranz S.Rubio O.Matilla J.V.GiganteT.Coutinho J.Ribas L.Krause S.Blanch R.Suñé
21
DFC 21
22
DFC 22 General components –Crates CPCI (CPU: ADLINK & INOVA) –ADC/DAC/Counter (NI & ADLINK) PLC bench test –Siemens, Wago, Beckhoff, ABB Hardware Siemens WagoBeckhof ABB CPCI Application programs API Clients(GUI, Scripts) Hardware Dserver (TANGO)