1
Version Mars 12, 2002Zensol Automation Inc. TIMING TESTS - ALABAMA NEXTPREVIOUS BACK PAGE 1 b Perform timing tests on a 3 contact breaker Breaker preparation for the test Breaker preparation for the test Cable installation by the operators Cable installation by the operators Travel transducer kit installation Travel transducer kit installation The CBA-32P The CBA-32P perform the test with CBA WIN test plan perform the test with CBA WIN test plan Conclusion Conclusion
2
Version Mars 12, 2002Zensol Automation Inc. b Isolate the breaker thanks to the sectionnors NEXTPREVIOUS BACK PAGE 1 The sectionnors are open TIMING TESTS - ALABAMA
3
Version Mars 12, 2002Zensol Automation Inc. b Ground the breaker NEXTPREVIOUS BACK PAGE 1 Grounding of the breaker Ground cable TIMING TESTS - ALABAMA
4
Version Mars 12, 2002Zensol Automation Inc. b Cable of the CBA-32P NEXTPREVIOUS BACK PAGE 1 Contact cables Ground cable Command cable Extension cables TIMING TESTS - ALABAMA
5
Version Mars 12, 2002Zensol Automation Inc. b The CBA-32P Grounding of CBA- 32P 24 contact CBA-32P Command 6 analog inputs Fiber optic link Standard labtop computer NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
6
Version Mars 12, 2002Zensol Automation Inc. b Installation of CBA-32P NEXTPREVIOUS BACK PAGE 1 Breaker with 3 separate tanks CBA-32P Control cabinet computer TIMING TESTS - ALABAMA
7
Version Mars 12, 2002Zensol Automation Inc. b Contact connections NEXTPREVIOUS BACK PAGE 1 Simple contact Resistive contact Double resistive contact Typical configuration of a 3 contact breaker TIMING TESTS - ALABAMA
8
Version Mars 12, 2002Zensol Automation Inc. b Command connections NEXTPREVIOUS BACK PAGE 1 Ouverture des contacts Fermeture des contacts TIMING TESTS - ALABAMA
9
Version Mars 12, 2002Zensol Automation Inc. b Travel transducer kit installation NEXTPREVIOUS BACK PAGE 1 Mechanical basis allowing the positionning of the transducer on the breaker Linear travel transducer TIMING TESTS - ALABAMA
10
Version Mars 12, 2002Zensol Automation Inc. Load a test plan with the CBA Win © software NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
11
Version Mars 12, 2002Zensol Automation Inc. b Performing the test NEXTPREVIOUS BACK PAGE 1 Fiber optic Test link Cable test link TIMING TESTS - ALABAMA
12
Version Mars 12, 2002Zensol Automation Inc. b Fiber optic test link NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
13
Version Mars 12, 2002Zensol Automation Inc. b Cable test link NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
14
Version Mars 12, 2002Zensol Automation Inc. b We can now start the test NEXTPREVIOUS BACK PAGE 1 Start acquisition TIMING TESTS - ALABAMA
15
Version Mars 12, 2002Zensol Automation Inc. b Test : Close NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
16
Version Mars 12, 2002Zensol Automation Inc. b Test : Open NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
17
Version Mars 12, 2002Zensol Automation Inc. b Test : Close Open NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
18
Version Mars 12, 2002Zensol Automation Inc. b Tabular report NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA
19
Version Mars 12, 2002Zensol Automation Inc. b Tabular report (continued) NEXTPREVIOUS BACK PAGE 1 TIMING TESTS - ALABAMA