SL500 Modular Library System
2
Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack, install & configure the library. De-install the Library. Configure switches, bridges and hubs. Label and route cables drives to other equipment. Verify and /or install library firmware.
3
Objectives Setup and operating performance. Diagram and document the installation. Update the site logs to reflect the customer’s subsystem configuration.
4
Prerequisites SL500 Principles of Operation SAN Concepts and Connectivity. L-Series Library course. LTO Ultrium course. SDLT course.
5
Personal Safety Safety Precautions Lifting Techniques Shoulder, Elbow, Wrist, and Hand Safety Fiber -optic Safety Rack Safety
6
Product Precautions Electrostatic Discharge (ESD) Damage Prevention ESD Precautions ESD Protection Procedure Prepare the work Area Access the Equipment Replace components Cleanup Fiber – optic Cable Installation Cable routing Cable Management Connector protection
7
Planning the Installation General Information Prepare the Installation location Knowledge in SCSI principles Knowledge in Fibre channel principles Configuration Diagram
8
SL500 Tape Library Types Library with LTO Cartridge Slots Library with Mixed-Media Cartridge Slots
9
Library with LTO Cartridge Slots The Base module contains 50 cartridge slots One or two tape drives 5 – slot cartridge access port(CAP)
10
Library with LTO Cartridge Slots base module
11
LTO Slot Physical Configurations Slot Numbering scheme Four Integers 1.Library number 2.Library module number 3.Library row number 4.Library column number
17
Library with Mixed - Media Cartridge Slots
22
Library and Rack Dimensions
24
Library Components Weights
25
Library Environment Specifications
26
Power for Library Without Tape Drives
27
Power for Base Unit and Two LTO Tape Drives
28
Installing EZ Hardware Compatibility Issues
29
Installation Steps Unpacking Inspection Preparation of Rack Install Base Unit Install Robotics Unit Install Façade Install an Expansion Module Install the Drive Tray Assemblies Install the Power Cables Install the Library SCSI or Fiber Channel Cables Inserting Cartridges Locking the Front Door and Powering-on the Library
30
Base Module Accessory Kit
31
Expansion Module Accessory Kit
32
SCSI Cabling
33
Fiber Channel Cabling
34
Inserting Cartridges
35
Powering - on the Library
36
Recording the Configuration Library Configuration Information
37
Recording the Configuration Tape Drive Configuration Information
38
Security & Password
58
FRU and Spares Replacement Library FRU list Drive FRU list
59
Library FRU List Cards MPU2 MPW RLB RLC RLE RLM Fans Operator Panel Power Supply Robotics unit Drive FRU list
60
Drive FRU List RLD Card Fan Tape Drive Brick
61
Remote Access Tools Stream Line Library Console Service Delivery Platform(SDP) Motive Insight ACSLS