Download presentation
Presentation is loading. Please wait.
Published byMartha Murphy Modified over 9 years ago
1
Projects THE BASIL READ GROUP Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke. Dr Michael Roberts, TWP SAIMM Zimbabwe Branch May 2010
2
Who are we? Basil Read Construction Buildings Roads Civils MiningDevelopmentsEngineering Basil Read Engineering TWP
3
Who are we?
4
A generic description of some project work undertaken in Zimbabwe by TWP. What do we do?
5
Pickstone-Peerless hydrothermal gold deposits. Activity
6
Location
7
Pickstone-Peerless hydrothermal gold deposits. A plant will be built on site to treat a sulphide dump. Later there might be consideration given to going underground. Activity
8
Unki declines on the Great Dyke. Activity
10
Unki declines on the Great Dyke. Declines completed. Activity
11
Evaluating and assisting with respect to efficient Chrome mining associated with the Great Dyke.
12
Activity Optimise mining and process engineering on the Great dyke with respect to Platinum group elements. How done. Optimise mineralogy, mining and process engineering by recognising that the ore body is not homogeneous.
13
The Bushveld complex
14
The Great dyke
15
There might be some commonality with respect to structure in the Bushveld and the Great Dyke. Mining on the Bushveld and Great dyke
16
Easy mining on the Great Dyke
17
Easy mining on the great dyke
18
Easy mining on the Great Dyke
19
Easy mining on the Bushveld
20
Difficult mining on the great dyke
21
Difficult mining in the Bushveld
22
Some commonality with respect to structure in the Bushveld and the Great Dyke. Flexural slip thrust faults. Great dyke
23
Flexural slip thrust fault
24
What is a flexural slip thrust fault? Ore body Section Flexural slip thrust fault Flat Ramp
25
Flexural slip thrust fault Flat Ramp
26
Flexural slip thrust fault on the Great Dyke ?????
27
Flexural slip thrust fault - origins
30
Flexural slip thrust fault - origin
31
Scientific description of a flexural slip thrust fault Part of the Platmine Research Programme funded by: Anglo Platinum Impala Platinum Lonmin Peer reviewed scientific paper referenced: S. Perritt and M.K.C. Roberts “Flexural-slip structures in the Bushveld Complex, South Africa?” Journal of Structural Geology, Volume 29, Issue 9, September 2007, Pages 1422-1429. S. Perritt and M.K.C. Roberts “Flexural-slip structures in the Bushveld Complex, South Africa?” Journal of Structural Geology, Volume 29, Issue 9, September 2007, Pages 1422-1429.
32
Fall of ground fatalities over a set period Curved joint moved as a precursor to fall of ground Thrust fault or curved joint directly fell on deceased Seismic causes Other reasons for fall of ground 9/3215/322/326/32 Breakdown as to cause of 32 fall of ground fatalities
33
Pillar failure due to gouge on flexural slip thrust fault
34
Gouge
35
Pillar failure due to gouge on flexural slip thrust fault
36
Understanding the structures Understanding geological structures within the ore body. Rock mass ratings. Rock strengths Mining method. Appropriate mining span Excavation support Structural geology Rock engineeringMining engineering Knowledge gap
37
Understanding the structures Understanding geological structures within the ore body. Rock mass ratings. Rock strengths Mining method. Appropriate mining span Excavation support Structural geology Rock engineeringMining engineering Knowledge gap Expect surprises and production disruptions
38
Understanding the structures Understanding geological structures within the ore body. Rock mass ratings. Rock strengths Mining method. Appropriate mining span Excavation support Structural geology Rock engineeringMining engineering Expect smoother production profile No knowledge gap
39
TWP Plant Design Example
40
Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.