S. Dasu, University of Wisconsin September 2003 - 1 Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,

Similar presentations


Presentation on theme: "S. Dasu, University of Wisconsin September 2003 - 1 Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,"— Presentation transcript:

1 S. Dasu, University of Wisconsin September 2003 - 1 Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration, Chain and Slice Tests Schedule and Milestones RCT Personnel: Faculty:S. Dasu, W. H. Smith Physicists:P. Chumney, Monika Grothe (New) Students:C. Hogg (UG) Engineers:T. Gorski (Lead Engineer), M. Jaworski, P. Robl (Physical Sciences Laboratory), J. Lackey (Retired, July 2003) Technician:R. Fobes

2 S. Dasu, University of Wisconsin September 2003 - 2 AlgorithmsAlgorithms

3 S. Dasu, University of Wisconsin September 2003 - 3 OverviewOverview

4 S. Dasu, University of Wisconsin September 2003 - 4 Calorimeter Geometry EB, EE, HB, HE map to 18 RCT crates Provide e/  and jet,  E T triggers

5 S. Dasu, University of Wisconsin September 2003 - 5 Trigger Mapping

6 S. Dasu, University of Wisconsin September 2003 - 6 160 MHz point to point backplane (prototype tested) 18 Clock&Control (prototype tested), 126 Electron ID (prototype tested), 18 Jet/Summary Cards -- all cards operate @ 160 MHz Use 5 Custom Gate-Array 160 MHz GaAs Vitesse Digital ASICs Phase, Adder, Boundary Scan, Electron Isolation, Sort (manufactured) Calorimeter Trigger Crate Spares not included* Data from calorimeter FE on Cu links @ 1.2 Gbaud Into 126* rear Receiver CardsInto 126* rear Receiver Cards Prototype tested w/ ASICsPrototype tested w/ ASICs

7 S. Dasu, University of Wisconsin September 2003 - 7 First Full RCT Crate 18 Such Crates make up the full RCT System covering |  |<5 & 0 <  < 2 . Rear: Receiver CardsFront: Electron, Jet, Clock Cards

8 S. Dasu, University of Wisconsin September 2003 - 8 Front Rear Std. VME Slots Second Generation Crate & Backplane 160 MHz with 0.4 Tbit/sec dataflow (point-to-point) Tests indicate good signal quality Designed to incorporate all algorithms Non-Isolated Electron, Tau & Jet Trigger primitives Most data paths checked manually and with JTAG, and with loop-back cables. VME Power Supply Custom Point-to-point Dataflow VME 48V externally supplied Custom Point-to-point Dataflow

9 S. Dasu, University of Wisconsin September 2003 - 9 Second Generation Clock & Control Card Fans out 160 MHz clock & adjusts phase to all boards Design validated - With small changes, layout and routing of production version completed - Ready for full production. DC-DC Converters Clock delay adjust

10 S. Dasu, University of Wisconsin September 2003 - 10 Second Generation Receiver Card Top side with 1 of 8 mezzanine cards & 2 of 3 Adder ASICs DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Bottom side with all Phase & Boundary Scan ASICs Full featured board & Phase, Boundary Scan & Adder ASICS fully validated. Production Started (ASIC production finished). Eight Boards built and tested in full crate test. Full quantity of mezzanine link cards (1422) are manufactured.

11 S. Dasu, University of Wisconsin September 2003 - 11 RCT 4 x 1.2 Gbaud Copper Link Cards & Serial Test Card Compact Mezzanine Cards for each Receiver Card accept 4 x 20 m 1.2-Gbaud copper pairs transmitting 2 cal. tower energies every 25 ns with low cost & power. Uses Vitesse Link Chips (7216-01). Final Serial Link Test Card (STC) Status: Already commissioned, cables, cards, 48V PS, and support software, delivered to CERN in March, operating in ECAL Electronics lab stably with no errors for months. Delivered to Princeton for HCAL tests in June and operating stably with no errors since. Two pairs in use @ UW for testing receiver mezzanine cards.

12 S. Dasu, University of Wisconsin September 2003 - 12 Second Generation Electron Isolation Card Full featured final prototype board is fully validated - production underway 8 boards made and tested as part of full crate test. Electron ID & Sort ASICs validated and production complete SORT ASICs EISO

13 S. Dasu, University of Wisconsin September 2003 - 13 Jet/Summary Card Full function prototype manufactured and tested. Uses SORT ASICs to find top four e/ , threshold for muon bits, both to GCT Region energies to GCT Absorbs HF functionality with Rec. Mezz. Card, HF sent to GCT. Integration test with GCT Done - Change in termination - Production to start shortly Receiver Mezz. Card Sort ASICs Cables To GCT Backplane: Two e/  per region. Region E T Sums BSCAN ASICs BSCAN ASICs Phase ASIC

14 S. Dasu, University of Wisconsin September 2003 - 14 RCT Test Suites Receiver Card (~150) Cycle memory at speed - all paths beyond Phase ASIC exercised JTAG to test some circuits in detail A fraction of inputs (4 - 8) from STC transmitters Covers full data path Electron Isolation Card (~150) Input by cycling RC memories Multiple cards (corner data by loop back cables) JTAG to test some circuits in detail Jet/Summary Card (~20) Input by cycling RC memories Full crate with RCs + EICs used HF path test using STC transmitter Output to Jet Capture Card for testing (in design)

15 S. Dasu, University of Wisconsin September 2003 - 15 Software Work Crate Processor Hardware & Software Present status: Old MVME Processor and software Needs replacement by new CMS Compatible System New Hardware & New Software Software for debugging production boards Developing diagnostics software for each board Ship data for analysis outside crate processor Use tools well known to physicists Final software (in XDAQ) - Design work beginning Want to reuse as much of test software as possible Need to add CMS Interfaces Software will be integrated with CMS Online code for operations Monitoring/controls, diagnostics, configuration downloading and documentation, modeling, physics simulation, etc. Personnel P. Chumney, S. Dasu, M. Grothe

16 S. Dasu, University of Wisconsin September 2003 - 16 Production Testing Tasks: 2003 - 2005 Testing software VME Code + Conversion to SBS - S. Dasu, P. Chumney RC & EIC Test Suites (JTAG…) well underway - P. Chumney Jet/Summary Output verification code - M. Grothe Integration of test software in XDAQ - P. Chumney, M. Grothe Mezzanine cards (2003) 4 months to test ~1400 cards - M. Jaworski & M. Grothe Full Board Production & Test (2004-2005): ~ 150 each Receiver & Electron Cards, ~ 20 each Jet, Clock Cards, Backplanes & Crates need testing - All Repair & Inventory - R. Fobes Test full crates for delivery (2005) 1 year for testing full complement of crates - all Use custom card to capture output of J/S - Jet Capture Card - Under design - T. Gorski Provides trigger for slice test

17 S. Dasu, University of Wisconsin September 2003 - 17 Integration and Chain Tests Integration Tests (2003) Serial Test Cards for input link tests 1 pair at CERN for ECAL integration since March. 1 pair at Princeton for HCAL integration since June. Remaining 6 are being used for receiver mezzanine card production testing at UW Will be reused to pump data to RCT for full test (2005) Pre-production Prototype Full Crate tests Global Calorimeter Trigger (Bristol group) integration at Madison in August is successful - Termination scheme agreed - Minor changes to UW JSC and Bristol IC Integration Tests (2004) Augment above tests with additional electronics from ECAL, HCAL, & GCT groups as becomes available. Initiate Slice Test

18 S. Dasu, University of Wisconsin September 2003 - 18 Slice Tests and Trigger Commissioning Slice Tests (Starting Late Summer 2004) Use full crate of tested production boards Will remain at CERN as spare boards and crate JSC Output Capture Card provides test trigger Personnel: M. Grothe moves to CERN, assisted with visits by others Trigger Commissioning (Starting April, 2005) All eighteen crates - fully tested and shipped to CERN All electronics rechecked in electronics test facility Full commissioning underground in USC55 Personnel: When production finishes, P. Chumney moves to CERN to join M. Grothe, assisted with visits by others.

19 S. Dasu, University of Wisconsin September 2003 - 19 RCT Conclusions Regional Calorimeter Trigger All pre-production prototype boards and ASICs built & validated All boards, ASICS, & crates are either produced, in production or about to start production Integration tests w/ECAL,HCAL, GCT have started Very good progress, but… Major work from now on: Production Testing of ~1800 Boards Software Development - Integration with XDAQ Slice Test Preparation + Software Installation and Commissioning Operations! We have the team in place to do the job!