September 11, 2013 Association of California Airports C ONTRACTING FOR C ONSTRUCTION M ANAGEMENT S ERVICES.

Similar presentations


Presentation on theme: "September 11, 2013 Association of California Airports C ONTRACTING FOR C ONSTRUCTION M ANAGEMENT S ERVICES."— Presentation transcript:

1 September 11, 2013 Association of California Airports C ONTRACTING FOR C ONSTRUCTION M ANAGEMENT S ERVICES

2 Advisory Circular 150/5100-14D Definitions Planning Services A/E Services Preliminary Design Phase Bidding & Negotiation Phase Construction Phase Special Services

3 A/E Services Construction Phase Considered Basic or Construction Administrative Services DO NOT satisfy requirements of AC 150/5300-12A

4 Advisory Circular 150/5100-12A Quality Control of Construction for Airport Grant Projects Sponsors Responsibilities Engineering Services (150/5100-14) Pre-design, Pre-bid, and Preconstruction Conf (150/5300-9) Supervision and Inspection

5 150/5370-12A c. Supervision and Inspection Mandatory for Airport Improvement Program (AIP) Projects – Design Phase (150/5370-10 Standards for Specifying Construction of Airports) – Construction Phase Beyond the Scope of A/E Services May be provided by Sponsor/Consulting Engineer/Separate Agreement

6 Criteria For Selection Qualifications Prior field experience Qualified to make interpretations of the design INTENT Have knowledge of Testing Requirements

7 Single Consultant vs Separate Agreement Pros Clearly understands the INTENT of the Drawings Produces Biddable/Buildable Projects Reduce Delays in RFI/Submittal process Reduce Delays in the inevitable Changed Condition/CCO pursuit Saves Construction $ by minimizing delay costs

8 Single Consultant vs Separate Agreement Pros Clearly understands the INTENT of the Drawings D.O.R.

9 Single Consultant vs Separate Agreement Pros Produces Biddable/Buildable Projects DOR with Construction Experience

10 Single Consultant vs Separate Agreement Pros Reduce Delays in RFI/Submittal process DOR provides immediate response

11 Single Consultant vs Separate Agreement Pros Reduce Delays in the inevitable Changed Condition/CCO pursuit Saves Construction $ by minimizing delay costs

12 Single Consultant vs Separate Agreement Cons Perception of a Conflict of Interest Protection from Design Errors/Omissions that cause additional cost

13 Contracting for Construction Management Services Conclusion: Question/Comments