Puesta Del Sol II Progress and Update Report May, June, & July, 2000.

Similar presentations


Presentation on theme: "Puesta Del Sol II Progress and Update Report May, June, & July, 2000."— Presentation transcript:

1

2 Puesta Del Sol II Progress and Update Report May, June, & July, 2000

3 The Stainless Steel Ladder $2,100 US  Side View  Top View

4 Guards uniforms & security  Uniform  Hat  Days.......Rafael  Nights.....Tolentino  Sundays.. Rafael Tolentino Luis

5 No Glass Containers

6 Pool Maintenance  Pressure wash monthly  Ordered 5 new lights  Ordered tile to fix small damaged tiles  To regrout in September

7 Wind Turbines  Installed 4 Wind Turbines on sewer vents  Act as wind powered extractors creating a negative pressure on sewer vents  Reduce odor on windy days in the condos

8 AC Leak on Roof.....7 South

9 Leaking roof 7 North  Old leak coming through AC plumbing  Fiberglassed panels on roof and side  To do similar work on South side to prevent future leak

10 Attic Tour...TV....OTIS

11 Water Meters......16 installed

12 Spiral Stairs to be repainted

13 The Box on the side

14 September 16 to 23....closed POOL AREA  regrout pool  replace pool lights  replace glass  install barrier I and II  install Jacuzzi pump  rewire pool room BUILDING clean cistern replumb water pump elevator, tile floor. paint shaft. & cable repairs paint spiral stairs general cleaning & painting