Download presentation
Presentation is loading. Please wait.
Published byDale McLaughlin Modified over 9 years ago
1
Capability Maturity Model Integration Project Monitoring and Control Software Management 2008 – 2009 Alexander Ide Niels Soetens
2
Alexander Ide Niels Soetens 2 / 25 Project Monitoring and Control Purpose Monitoring the project’s process Recognize deviation of the project plan Significant deviation? → take corrective actions
3
Alexander Ide Niels Soetens 3 / 25 Project Monitoring and Control Specific Goals SG 1 Monitor Project Against Plan SP 1.1 Monitor Project Planning Parameters SP 1.2 Monitor Commitments SP 1.3 Monitor Project Risks SP 1.4 Monitor Data Management SP 1.5 Monitor Stakeholder Involvement SP 1.6 Conduct Progress Reviews SP 1.7 Conduct Milestone Reviews
4
Alexander Ide Niels Soetens 4 / 25 Project Monitoring and Control Specific Goals Usage of Trac Create and assign tickets to a specific person Create deadline (usually milestones) Easy to monitor the completion of a milestone Other: Microsoft project,… SP 1.1 Monitor Project Planning Parameters
5
Alexander Ide Niels Soetens 5 / 25 Project Monitoring and Control Specific Goals
6
Alexander Ide Niels Soetens 6 / 25 Project Monitoring and Control Specific Goals Commitments are set with every milestone Regularly review commitments (at meeting) Identify commitments that have not been satisfied SP 1.2 Monitor Commitments
7
Alexander Ide Niels Soetens 7 / 25 Project Monitoring and Control Specific Goals Usage of War Room List Specify the risk and rate its importance Communicate and discuss risks at meetings Resolve major risks as quick as possible SP 1.3 Monitor Project Risks
8
Alexander Ide Niels Soetens 8 / 25 Project Monitoring and Control Specific Goals
9
Alexander Ide Niels Soetens 9 / 25 Project Monitoring and Control Specific Goals Periodically review documentation Identify and document issues and impacts Documentation on Trac, Dropbox, Googlegroups, SVN SP 1.4 Monitor Data Management
10
Alexander Ide Niels Soetens 10 / 25 Project Monitoring and Control Specific Goals Periodically review stakeholder involvement Hadra case: Project review (Markomo) Gathering workflow informatio (Guido) MashedUp case: Assitents = stakeholders and monitor everything Document results made by stakeholder involvement SP 1.5 Monitor Stakeholder Involvement
11
Alexander Ide Niels Soetens 11 / 25 Project Monitoring and Control Specific Goals Progress reviews with assistants Daily small scrum meetings Sprint scrum meetings SP 1.6 Conduct Progress Reviews
12
Alexander Ide Niels Soetens 12 / 25 Project Monitoring and Control Specific Goals Two week milestone review meeting Review accomplished work Weekly review meeting with assistant Guidance with the projects progress In MashedUp these are +- stackeholder meetings SP 1.7 Conduct Milestone Reviews
13
Alexander Ide Niels Soetens 13 / 25 Project Monitoring and Control Specific Goals SG 2 Manage Corrective Action to Closure SP 2.1 Analyze Issues SP 2.2 Take Corrective Action SP 2.3 Manage Corrective Action
14
Alexander Ide Niels Soetens 14 / 25 Project Monitoring and Control Specific Goals Collect and analyze issues List issues needing corrective actions Analyze issues to determine need for corrective action SP 2.1 Analyze Issues
15
Alexander Ide Niels Soetens 15 / 25 Project Monitoring and Control Specific Goals Corrective action plan Revising estimates and plans Adding resources Changing processes Revising project risks SP 2.2 Take Corrective Action
16
Alexander Ide Niels Soetens 16 / 25 Project Monitoring and Control Specific Goals Monitor corrective actions Analyze results of corrective actions Determine and document appropriate actions SP 2.3 Manage Corrective Action
17
Alexander Ide Niels Soetens 17 / 25 Project Monitoring and Control Generic Practices GG 2 GG 2 Institutionalize a Managed Process GP2.1 Establish an Organizational Policy GP2.2 Plan the Process GP2.3 Provide Resources GP2.4 Assign Responsibility GP2.5 Train People GP2.6 Manage Configurations GP2.7 Identify and Involve Relevant Stakeholders GP2.8 Monitor and Control the Process GP2.9 Objectively Evaluate Adherence GP2.10 Review Status with Higher Level Management
18
Alexander Ide Niels Soetens 18 / 25 Project Monitoring and Control Generic Practices GG 2 GP2.1 Establish an Organizational Policy Determine the roadmap that has to be followed to create a good monitor plan GP2.2 Plan the Process Create the planing of the process and maintain it GP2.3 Provide Resources Provide the resources, the programs and the systems
19
Alexander Ide Niels Soetens 19 / 25 Project Monitoring and Control Generic Practices GG 2 GP2.4 Assign Responsibility Determine who is in charge of the process GP2.5 Train People GP2.6 Manage Configurations Make levels of control to group the work products
20
Alexander Ide Niels Soetens 20 / 25 Project Monitoring and Control Generic Practices GG 2 GP2.7 Identify and Involve Relevant Stakeholders Examples of involvement: Assessing project against plan Reviewing: Project risks Progress Data management Resolving issues
21
Alexander Ide Niels Soetens 21 / 25 Project Monitoring and Control Generic Practices GG 2 GP2.8 Monitor and Control the Process GP2.9 Objectively Evaluate Adherence Checking if everything is according to plan GP2.10 Review Status with Higher Level Management
22
Alexander Ide Niels Soetens 22 / 25 Project Monitoring and Control Generic Practices GG 3 GG 3 Institutionalize a Defined Process GP3.1 Establish a Defined Process GP3.2 Collect Improvement Information e.g.: Records of significant deviations Corrective action results
23
Alexander Ide Niels Soetens 23 / 25 Project Monitoring and Control Findings Strengths Multitouch monitors workload. Opportunities for Improvement WAFL finds it difficult to control fellow students. WAFL underestimated the risks Proposed Actions
24
Alexander Ide Niels Soetens 24 / 25 Project Monitoring and Control Glossary CMMICapability Maturity Model Integration PMCProject Monitoring and Control
25
Alexander Ide Niels Soetens 25 / 25 Project Monitoring and Control References CMMI for Development version 1.2 http://www.sei.cmu.edu/publications/documents/06.reports/06tr008.html Software Quality Assurance within the CMMi framework http://www.software-quality-assurance.org/cmmi-project-monitoring-and- control.html
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.