Download presentation
Presentation is loading. Please wait.
Published byRuby McDaniel Modified over 9 years ago
1
Power Plant Construction and QA/QC Section 9.2 – Air Emission Controls Engineering Technology Division
2
2 Section 9.2 – Air Emission Controls Overview Air Quality Laws Required Cleaner Exhausts Clean Air Act - 1972 Standards for Power Plant Air Pollution - 2011 Precipitators Remove Fly Ash Chemical / Gas Conditioning Enhancements Continue to Remove Particulate
3
3 Section 9.2 – Air Emission Controls Electrostatic Precipitators 1.Ionize Gas 2.Charged Ions Attach to Ash 3.Ash Goes to Grounded Plates 4.Ash Falls to Collection Hoppers + - +
4
4 Section 9.2 – Air Emission Controls Electrostatic Precipitators Electrical Cost Collection System Disposal Cost Fly Ash Resistivity Temperature Chemistry Ash Buildup
5
5 Section 9.2 – Air Emission Controls Flue-Gas Conditioning Regulations Requirements Deadlines Gas Chemistry Costs Upgrade Condition New
6
6 Section 9.2 – Air Emission Controls Flue-Gas Conditioning – Sulfur Addition
7
7 Section 9.2 – Air Emission Controls Flue-Gas Conditioning – Ammonia Addition
8
8 Section 9.2 – Air Emission Controls Fluidized Bed Boilers
9
9 Section 9.2 – Air Emission Controls NO x Controls – Injection Burner Efficiency and Ammonia Addition Reduce NO x
10
10 Section 9.2 – Air Emission Controls Flue Gas Treatment
11
11 Questions? Section 9.2 – Air Emission Controls
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.