Download presentation
Presentation is loading. Please wait.
Published byGavin Carroll Modified over 9 years ago
1
International Workshop for doctorate students and young researchers Activation of building stock : Case study - Tama New Town, Tokyo 25-28 September 2006 Inter-University Seminar House, Hachioji, Tokyo, Japan Meta-technology Center for Metropolitan Metamorphosis Methods Tokyo Metropolitan University
2
Purpose of Workshop Activation of building stock Case study - Tama New Town, Tokyo ◆ To grasp the actual condition of building stock activation in various countries; ◆ To share solutions to common problems; ◆ To develop epoch-making ideas for activation of building stock; ◆ To develop world-standard human resources with comprehensive and practical knowledge.
3
Activation and renewal of Tama New Town which left behind the times. ◆ old apartment houses without lifts ◆ disused schools ◆ closed shopping centers Subject of Workshop
5
Groups
6
Theme of group working ① What do you activate ? ◆ the potential of each area viewpoint : planning, sociology, environment, design,... ◆ the utilization of existing building stock viewpoint : architectural design, structural engineering, architectural environment, building production,... ② How do you activate ? pull-down (demolition), rebuilding, remodeling, renovation, renewal, transformation (conversion), redevelopment,...
7
schedule 26 Sep AM ① introduction of Tama Newtown ② lecture by Mr. Buchoud ③ presentation of the situation in each countries
8
schedule 26 Sep PM ④ inspection of Nagayama and Suwa area ⑤ group discussion: impression and rough idea
10
schedule 27 Sep ① group activities ② preliminary presentation by groups ③ preparation for the final presentation And…
11
28 Sep AM ① final public presentation…
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.