Download presentation
Presentation is loading. Please wait.
Published byAnnis Owen Modified over 8 years ago
1
/ The Role of a Level Crossing Manager Presented by John Wilson Level crossing Managers Wales Route
2
/ Risk Assessments Pre Planning On site data collection Risk assessing Optioneering Finding Funding Closure and enhancements
3
/ Inspections Site visits Inspecting all assets Recording and reporting all faults Liaising with OTSM Prioritising faults based on Risk Carrying out minor maintenance
4
/ Road Rail Partnership Groups
5
/ Public Interactions School Visits ILCAD Building relationships with Authorised Users Meeting General Public Meeting with professional organisations
6
/ Awareness Days
7
/ Projects and Schemes
8
/ Offa’s Dyke Footpath BeforeAfter
9
/ Possible Closures
10
/ Duke of Edinburgh Award scheme Additional risks identified at level crossings Level crossing safety presentations at local schools Level crossing safety now being taught to all students nationally
11
/ Office of Rail Regulators Building relationships with ORR team Regular Visits to Cannock training crossing Practical demonstrations for LNE RAM team Footpath Crossing built by LCMs John and Jim
12
/ Crossing Misuse
13
/ Misuse Cont:-
14
/
15
/
16
/
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.