734073 Bridge Abutment Repair Old King’s Road
2
734073 Location; Old King’s Road N 734063
3
Old King’s Road Bridge (734073) existing structure Built in 1962
4
September 26, 2014 Rainstorm
8
Fill and compact the voids as much as possible and restore the concrete flume over the damaged area … Done.
9
Inject a soil stabilizing chemical grout under the repair to force water out, fill all the voids that could not be reached and consolidate and bind the soil together.
10
Before the rain event Lehigh Canal Native Soil Fabriform Slope Protection
11
Erosion after the rain event Lehigh Canal Native Soil Erosion behind slope protection Fabriform Slope Protection Flume removed to repair erosion
12
Phase 1 Repair Lehigh Canal Native Soil Void filled with road base Fabriform Slope Protection Flume repaired
13
Phase 2 Repair (Chemical Grout Installed) Lehigh Canal Native Soil Chemical Grout injected into fill Fabriform Slope Protection
14
Uretek Holdings was selected to perform the work subject to the terms, conditions and pricing of the FDOT Contract No. BDV76, which is a statewide contract that was competitively bid. Uretek Holdings has agreed to perform the work with a not to exceed cost of $39,600 with 36,000 pounds of material.
15
2015 Approved Budget Budgeted$50,000 Uretek Contract$39,600 Remaining:$10,400
16
As soon as possible Tentative Schedule Should be a one day job and as soon as the contractor can work the project into their schedule