Download presentation
Presentation is loading. Please wait.
Published byMiles O’Brien’ Modified over 8 years ago
1
APEC-TEL Broadband Study TEL03/2009A – status report Bangkok, May 20 th
2
Project status Overview Current status of the project I II III IV Workshop Preparation Final draft ready after several internal reviews Finalized executive summary, introduction, conclusion, appendix and glossary Final draft ready after several internal reviews Work package has been approved and signed off Prepare and conduct APEC-TEL44 workshop (Malaysia, end of September) Final report including approved Part I-IV done PartActivitiesStatusNext steps
3
Page 2 Project timelines 20102011 DecJanFebMarAprMayJunJulAugSep Consider survey input WP 3: Analysis of social impacts on broadband development and internet usage (Task 19-22) Context analysis Draft WP3 Consider survey input WP 4: Best practices in broadband development and internet usage (Task 23-27) Best practices in BB development Draft WP4 Recommendations for implementation WP 5: Workshop and final report (Task 28-32) TEL44 tbc Prepare and conduct workshop Survey (send out, get feedback) Final report (OSIPTEL-DETECON-APEC) WP 2: PPP for investment in broadband Development (Task 12-18) Regulatory policy intervention Work Package Draft WP2 Industrial policy intervention Survey (develop, align) Write up Draft WP1 Data collection WP 1:Analysis of current broadband development and internet usage (Task 1-11) Overview The project started on 22.12.2010. It is structured into 5 parts as outlined in the RFP document. Final Report 1 st draft WP1-4 2 nd draft WP1-3 today review & approval All content creation and activities planned for the study has been finished Jan 2012
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.