Download presentation
Presentation is loading. Please wait.
Published byGodfrey Tate Modified over 8 years ago
1
SIZE-UP
2
OBJECTIVE Describe the three phases of size-up and their relationship to problem identification. Three Phases of Size-up Phase one: Preincident information Phase Two: Initial Size-up Module 2 Overview
3
OBJECTIVE Describe the factors that affect size-up. Risk/Benefit Evaluation Command Decisions Brief Initial Report Module 2 Overview
4
OBJECTIVE Given a simulated structural fire incident, demonstrate the ability to conduct an effective size-up, identify the problems presented, and communicate critical information as part of a concise size- up report Phase Three: Ongoing Size-Up Module 2 Overview
5
WHAT IS SIZE-UP?
6
THREE PHASES OF SIZE-UP
7
Three Phases of Size-up Phase One:Preincident information Phase Two:Initial Size-up Phase Three:Ongoing size-up
8
PHASE ONE: PREINCIDENT INFORMATION
9
Phase One: Preincident Information Size-up is more than what you see through the window when you arrive at the scene. A wealth of information available prior to alarm.
10
Size-Up Definition Preincident information includes factors known before the incident that may affect decisions or actions.
11
WHAT TYPES OF INFORMATION ARE AVAILABLE AND USEFUL BEFORE THE INCIDENT
12
Value of Preincident Information to the Incident Commander (IC) Understand what has happened. Identify problems. Predict what is going to happen. Understand resource needs.
13
Value of Preincident Information to the Incident Commander (IC) Development of strategy and tactics. Identify safety considerations.
14
IT’S HARD TO OBTAIN PREINCIDENT INFORMATION WHEN THE FLAMES ARE LICKING AT THE BOXES OF DYNAMITE.
15
Preplans Give the IC a jump start on understanding the situation and developing an action plan. Can help IC consider all the important factors when used at the scene.
16
Occupancy Information Occupancy type –Different problems –Impact on strategy and tactics
17
Occupancy Information Building Construction –Construction type –Impacts on fire behavior –Vertical openings versus compartmentalization
18
Occupancy Information Built-in protection –Sprinklers, standpipes, alarm systems, fire doors, etc. –Assist in controlling situation
19
Occupancy Information Building contents –Impacts on action plan
20
Occupancy Information Utility control –What utilities are present? –Where are controls located? –Positive effect on safety and incident control
21
Water Supply Most commonly use extinguishing agent. Location Availability Reliability Delivery system
22
Environmental Conditions Can lengthen response times. Can affect fire behavior. Can affect how long and how fast firefighters can work. Apparatus may freeze up or overheat.
23
Time of Day Traffic at peak times can delay response. Occupancy of buildings varies. Volunteer and combination departments may respond with fewer firefighters during business hours.
24
Departmental Resources Apparatus and equipment Personnel
25
Interagency/Private Sector Assistance Already there at many incidents. IC must know what resources are available prior to the incident. Many sources of assistance. Maximizes use of fire department resources.
26
PHASE TWO: INITIAL SIZE-UP
27
A rapid mental evaluation of various factors related to an emergency incident.
28
First Objective is to Identify Problem(s) Calmly assess conditions. First chance to get into proactive mode. Done prior to defining solutions. Potential hazards to firefighters
29
Use Preincident Information to Help With Initial Size-up Preplans Typical occupancy Other resources responding
30
Use Preincident Information to Help With Initial Size-up Water supply in area Special hazards or problems Environmental conditions Time of day
31
Dispatch information can give an indication of the extent of problems “Structure fire, 14 Railroad Street, Engines 1, 2, and 3, Truck 1 Respond” “Receiving multiple calls, reported persons trapped, etc….”
32
What should initial size-up include? What do I Have
33
What should initial size-up include? What do I Have Where is it going?
34
Be Pessimistic Murphy’s Law is always on the incident.
35
What should initial size-up include? What do I Have Where is it going? How do I control it?
36
WALLACE WAS HOT can be used for training on the factors that impact size-up.
37
Size-up Factors Water Apparatus/personnel Life Location/Extent Area Construction Exposures Weather Auxiliary appliances Special hazards Height Occupancy Time
38
Trying to remember all 13 factors at the incident can make your head hurt Not all factors are critical at every incident. Key-in on those factors that apply.
39
Large Group Activity 2.1 Initial Size-up information
40
Insert slide # 41, module 2
42
Insert slide # 43, module 2
44
Insert slide # 45, module 2
46
Insert slide # 47, module 2
48
Insert slide # 49, module 2
50
Insert slide # 51, module 2
52
Insert slide # 53, module 2
54
Insert slide # 55, module 2
56
RISK/BENEFIT EVALUATION
57
Risk/Benefit Evaluation The IC needs to determine if risks taken are worth benefits gained. –Firefighting is not without risk. –Don’t risk firefighters’ lives to do body recovery. –Condition of building.
58
If IC judges it is worth risk, for how long? Construction Resources Needed fire flow
59
Selecting Operational Mode Offensive Defensive Transitional
60
Offensive mode indicates IC chooses to make an aggressive interior attack Resources available to meet incident demands. Risk to firefighters worth the benefits gained.
61
Defensive mode indicates IC determines no entry will be made. Loss of building probable. Risk/benefit evaluation indicates risks too great. Not enough resources. Usually a master stream operation. Protect exposures. Keep personnel out of collapse zone and out of danger.
62
Selecting Operational Mode Transitional mode is when forces at the scene are switching from one operational mode to another.
63
Examples No entry made (defensive) until additional resources arrive, then attack fire (offensive). Confine fire (offensive) until rescue can be accomplished, then protect exposures (defensive) if resources not sufficient.
64
Resource Evaluation Do you have enough resources? Do you have the right resources?
65
Committing Resource Must have a chance for success. Assigned based on order of priorities. Must be coordinated.
66
Large Group Activity 2.2 Risk/Benefit Analysis
67
Insert slide # 68, module 2
68
Insert slide # 69, module 2
69
Insert slide # 70, module 2
70
Insert slide # 71, module 2
71
Insert slide # 72, module 2
72
Insert slide # 73, module 2
73
Insert slide # 74, module 2
74
Insert slide # 75, module 2
75
Insert slide # 76, module 2
76
Insert slide # 77, module 2
77
COMMAND DECISIONS
78
The first -arriving officer must determine their initial role: Command Combat Combative Commander
79
Command CO chooses to command the incident rather than engage in the tactical activities. Incident needs immediate coordination Sufficient resources on-scene or responding Combat role will not have a significant impact on the incident.
80
Combat Exercised by the CO when: –Their presence will have a positive impact on the operation at hand. –Command is passed Responsibility cannot be delegated.
81
Combat Commander Exercised by the CO when: –Their presence will have an immediate impact and transfer of command is not reasonable. –Fast moving fire –Additional resources may have long response times.
82
Combat Commander As soon as possible, command should be transferred to an officer who is not involved in the fire attack.
83
BRIEF INITIAL REPORT
84
Brief Initial Report First-arriving officer should paint a vivid word picture of conditions.
85
What do I have? Building description and occupancy type Description of conditions
86
Large Group Activity 2.32 Brief Initial Report -- “What do I Have?”
87
Dividing the Incident Manageable geographic segments to facilitate effective communication. Designate specific areas in and outside the building.
88
An example … ABCD Sectoring system STRUCTURE DIVISION A DIVISION B DIVISION C DIVISION D
89
INSERT SLIDE # 90, MODULE 2
90
INSERT SLIDE # 91, MODULE 2
91
Suggested Answers 2-story, 40’ x 80’, townhouse, Fire and smoke showing from Side A, 1st floor Smoke showing 2nd floor, Side A
92
Insert slide # 93, module 2
93
Insert slide # 94, module 2
94
Insert slide # 95, module 2
95
Insert slide # 96, module 2
96
Insert slide # 97, module 2
97
What am I doing? Actions being taken
98
What do I need? Instructions to other responding resources. Request for additional resources.
99
Who is in Command? Designate who has command. Designate command by incident name. Eliminates confusion during simultaneous alarms.
100
Good Size-up Report Alerts Others Responders adjust their thinking. Anticipate actions they need to take. Indication of scope of problem.
101
PHASE THREE: ONGOING SIZE-UP
102
Size-up Needs to be Ongoing Doesn’t stop with on-scene report. Increase knowledge of current conditions. Potential problems Effectiveness of tactical operations.
103
Situation Status: Ongoing Analysis of the Progress of the Incident What has happened? What is happening? What is going to happen?
104
Situation Status: Ongoing Analysis of the Progress of the Incident Determine if current plan is working. Identify changes or modifications that may need to be made to action plan.
105
Resource status: analysis of effectiveness of current resources and identification of needed or anticipated resources Assigned resources. Uncommitted resources. Responding resources. Anticipated resource needs.
106
Knowledge of resource status requires ongoing tracking of tactical activity of all resources operating at the incident.
107
Responsibility for Ongoing Flow of Information The IC needs to have as much information as possible. If IC is responsible for safety of personnel and management of the action plan, then information is critical.
108
Those responsible for carrying out action plan need to keep IC updated when: Assignment is completed. Assignment cannot be completed. Additional resources are needed. Resources can be released.
109
Those responsible for carrying out action plan need to keep IC updated when: Conditions have changed. Problems identified. Emergency conditions.
110
If IC doesn’t get regular updates -- demand them. All personnel should understand IC’s need to have the best information possible.
111
Size-up and problem identification is the THINKING phase of the command sequence.
112
Summary Three phases of size-up. Preincident information. Initial size-up. Ongoing size-up
113
Summary Preincident information can help the IC. Identify what has happened. Understand what is happening. Anticipate what is going to happen.
114
Summary Initial Size-up answers. What do I have? Where is it going? How do I control it?
115
Summary Important considerations that are a part of an initial size-up. Risk/Benefit analysis Resource evaluation Determination of operational mode.
116
Summary Ongoing size-up is important to the IC. Protects safety of personnel. Ensures action plan addresses problem. Helps IC anticipate changes. Everyone is responsible for the ongoing flow of information.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.