Download presentation
Presentation is loading. Please wait.
Published byMaximilian Rodgers Modified over 9 years ago
1
EF 151 Group Project Code Name: Frank
2
Team Members Josh Barnes Michael Mcmillan Dhaval Patel Christopher Tarpy
3
Construction Materials 1/2’ Thick 2x4 Board. Two PVC pipes and elbows. Two Hexagon bolts. Styrofoam tubing Two Marbles for Device Some assorted nails, screws, and trash!
4
Stage One The weighted marble goes down the Styrofoam tubing, which tilts up the other side of the PVC Pipe.
5
Stage Two Right in front of the bolt in the 2nd Pipe is a light marble. When the Pipe gets knocked up from the 1st Pipe it cause the marble to fall and goes down the ramp.
6
Final Stage The marble goes down the shoot, bouncing down to each platform. Until it falls in to the cup.
7
Complete Picture!!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.