Download presentation
Presentation is loading. Please wait.
Published byGriselda Dixon Modified over 9 years ago
1
Introduction to GCOS Richard K. Thigpen Implementation Project Manager GCOS Secretariat Geneva
2
GCOS Surface Network Around 1000 Stations Roughly 150-300 Km Spacing Mandatory Requirements: Monthly CLIMAT Report of Mean Temps, Total Precip Target Requirements Daily Temp, Precip, Pressure (SYNOP) Operated by National Met Services Biggest problems: No Monthly CLIMAT Reports Mis-Identification Old, Un-Calibrated Equipment
3
GSN
5
GCOS Upper Air Network About 150 Stations Uniform Global Distribution (5-10 Deg) Minimum Requirement At least 25 soundings/month to 30HPa Temp, Humidity, Wind Speed and Direction Target requirement (Draft) Temp, Wind, Humidity as High as Possible Biggest problems: Operating Costs Old Equipment
6
GUAN
7
Things We Have Done to Improve GUAN Direct Renovations CBS Lead Centers for GCOS Technical Support Projects
8
Competitive Purchases WMO procedures Has Lead to consistent prices Sometimes ground systems replaced Technology Improvements Require WMO Intercomparison
10
New GUAN Station at Dar es Salaam
11
New GUAN Station at Gan, Maldives
12
Yerevan, Armenia
13
Windhoek
14
Douala, Cameroun
15
Antananarivo, Madagascar
16
Bjelasnica circa 1890
17
Bjelasnica
18
Bjelasnica 1994
22
Revitalization Activities Equipment Replacement Hydrogen Generators and Upper Air Systems Gan, MaldivesDar es Salaam, Tanzania Windhoek, NamibiaHarare, Zimbabwe Yerevan, ArmeniaPenrhyn, Cook Islands Douala, CameroonAntananarivo, Madagascar Dakar, SenegalAddis Ababa, Ethiopia Nairobi, KenyaBauerfield, Vanuatu Honiara, Solomon Islands Laoag, Philippines Galapagos, EcuadorNiamey, Niger Mahe, SeychellesAbidjan, Cote d’Ivoire Radiosondes and Balloons To Many
27
CBS Lead Centers for GCOS JapanTakafumi Umeda USMatt Menne (Assisted by Stuart Hinson) British Antarctic SurveyJonathan Shanklin ChileJorge Carrasco MozambiqueDomingos (Mosquito) Patricio GermanyChristiana Lefebvre AustraliaKevin Smith MoroccoRachid Sebbari IranMina Jabbari
29
GCOS Technical Support Projects Four One Year Projects Established Pacific Islands (New Zealand Met Service) Caribbean (Private Company) SADC Africa (Botswana Met Service) Americas (Private Company) Visit Each GUAN Station 2 Times per Year Visit as Many GSN as Possible Monitor reports from all Stations
30
Technical Support Projects Site Visits: Better Meta Data Including Photos Around Sensor Suite Actual Location of Many are Wrong Many are no Longer Good Sites Calibration and Training
31
Photos Around Station Example
33
GCOS Cooperative Mechanism (GCM) Funds from Spain Latin American Countries Addressing Uruguay GSN Funds from UKMO Radiosondes, Yerevan, Seychelles, Maldives Funds From US Implementation Project Manager Some Projects
34
GCOS Cooperative Mechanism (GCM) Funds From Switzerland Support for Africa GSN Renovations in Angola Radiosondes for Dar es Salaam and Harare Next Likely to Renovate Luanda Upper Air
35
GCOS Cooperative Mechanism (GCM) Funds from Netherlands Africa Technical Support Several H2 Generators Funds from Germany Former CIS Countries Wind System for Bjelasnica Funds from Canada TSP for the Americas
36
Number of CLIMAT Received at NCDC
38
Thank You RKT
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.