Presentation is loading. Please wait.

Presentation is loading. Please wait.

Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Toolbar – Actions Architect The color of the field indicates the activity group of the respective.

Similar presentations


Presentation on theme: "Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Toolbar – Actions Architect The color of the field indicates the activity group of the respective."— Presentation transcript:

1 Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Toolbar – Actions Architect The color of the field indicates the activity group of the respective action: Preliminary design and design Planning to get building permission Detailed planning Production planning for prefabricated elements Preparatory works on-site (for renewal or prefabricated elements) Standard on-site construction works Design Architect Planning Architect Detailed Planning Architect Production Planning Tendering Architect On-site Preparation Architect On-site Installation Architect Completion Cost calc. Architect On-site Works Tendering different trades Cost calculation Prefabrication in fabrication hall (off-site) Architect Prefabrication off-site Installation of prefabricated elements Completion after on-site works or installation of prefab Cost statement Contract – Planning team P C Contract – Contractors € Milestones: Indication of main steps and relevant actions Design Freeze *

2 Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Examples Design Architect Planning Architect Detailed Planning Architect Production Planning Tendering On-site Preparation Architect On-site Installation Architect Completion Cost calc. Architect On-site Works Prefabrication off-site P C Design-Bid-Build € Design Architect Planning Architect Detailed Planning Tendering On-site Preparation Architect Completion Cost calc. On-site Works P C € Standard With prefabrication * *

3 Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Examples Design Architect Detailed Planning On-site Preparation Architect Completion Cost calc. Architect On-site Works C Design-Build € Tendering Planning P Architect Production Planning Architect On-site Installation Prefabrication off-site On-site Preparation Architect Completion On-site Works Design Cost calc. C € Tendering Planning P Standard With prefabrication € Cost optimization * *

4 Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Name of your case study/ project Please take action fields and milestones from the toolbar, adapt action fields or create new ones if necessary!


Download ppt "Renew School – WP 3 Cooperation models, Geier, 17.07.2014 Toolbar – Actions Architect The color of the field indicates the activity group of the respective."

Similar presentations


Ads by Google