Presentation is loading. Please wait.

Presentation is loading. Please wait.

6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.

Similar presentations


Presentation on theme: "6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October."— Presentation transcript:

1 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October 2001 U. Arizona, Tucson, AZ

2 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 2 Current project team: A. DresslerPrincipal Investigator B. BigelowInstrument Scientist Optical Engineering B. Sutin, H. Epps Mechanical Engineering: B. Bigelow, T. Hare, S. Gunnels, G. Luppino (Consult.) R. Cleary (drafting) Electrical Engineering J. Asa, D. Carr (Consult) Detector Systems: G. Burley, I. Thompson, J. Estrada Software Engineering: C. Birk, K. Clardy Fabrication: V. Kowal, R. Storts, J. Castillo, P. Ramirez

3 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 3

4 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 4 Optics Status: Collimator: C01 (Field lens) Finished, at OCIW C02 - C03Finished, mounted in cells C04 - C05At Spectrum TFL for coating Long Camera: L01 - L06 At Spectrum TFL for coating Short Camera: S01, S08Blanks at REOSC, specifications under revision S02 - S09At TORC for polishing

5 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 5 Optics Status cont. Filters: Two sets of UBRI filters matching those used by Arlo Landolt have been ordered from Barr. Grisms: Design of the grisms is in progress.

6 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 6 Current grating selection:

7 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 7 Mechanical Engineering Status: Guide camera stages (Hare)Assy. IP Mask server (Bigelow)Mods. IP Field Lens (Hare)Done LCAM shutter (Hare)Done Filter servers Done Disperser server (Hare)re-design, draft. IP

8 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 8 Mechanical Engineering cont. Collimator (Bigelow)Assy. IP Long camera (Bigelow)Ready for Assy. Short camera (Bigelow)Drafting IP Dewar (Luppino)Done Instrument Structure (Gunnels)IP

9 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 9

10 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 10

11 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 11 Center field guide camera assembled and tested

12 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 12 Principal and SH guide cameras being assembled 10/01

13 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 13

14 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 14 Field lens coated, in shipping fixture

15 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 15 Field lens cell

16 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 16 Collimator barrel ready for assembly

17 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 17 C02 during after final potting operation

18 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 18 C03 during first potting step

19 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 19

20 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 20 First grating tilt mechanism assembled

21 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 21 Long camera

22 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 22 Front and rear barrel stock. Rings for lens cells. LCAM materials at M&T, 5/01

23 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 23 LCAM scale control system assembled and operated

24 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 24 Long camera with shutter, FS, and dewar mounted

25 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 25

26 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 26

27 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 27

28 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 28

29 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 29

30 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 30 Convergent/Prima commercial 150W CO2 laser cutting system $270K (2 sec/slit).

31 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 31 Directed Light laser cutting system

32 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 32 Electronic Engineering: Dave Carr is providing electronics design for IMACS on a consulting basis. Status of electronics: (3) Motion control (MC) chassis, 1 Done, 1 IP (1) Power supply chassis, Done (1) Shutter control chassisDone (2) PI chassis (flexure & scale control)Done Schematics design (all motion stages)Done

33 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 33 Detector systems: Guider cameras: - 4 cameras at LCO, 5 more to be fabricated this year - 3 cameras for IMACS by end of 2001? Science arrays: - All CCDs in house - Dewar and detector system mechanics in house - First OCIW science controller (with 1 CCD) operating

34 6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 34 Detector systems continued: Five science cameras planned for assembly in 2001: - 2K x 4K lab system - Red and Blue 2K x 4K cameras for MIKE - 4K x 4K camera - IMACS 8K x 8K Jorge Estrada now assisting with electronics assembly of the guiders and eventually, the science arrays.


Download ppt "6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October."

Similar presentations


Ads by Google