ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007.

Similar presentations


Presentation on theme: "ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007."— Presentation transcript:

1 ORANGE COUNTY TRAFFIC MANAGEMENT SYSTEM FEBRUARY 13, 2007

2 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

3 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

4 Project Overview Year 2000 $7.5 Million Grant from FDOT Traffic Signal Control Variable Message Sign Control Highway Advisory Radio / Telephone Emergency Vehicle Route Pre-Emption Portable Work Stations Real Time Adaptive Control Internet Server: Link FDOT, Counties & Cities

5 Year 2000 $7.5 Million Grant from FDOT –Upgrade Orange County Traffic Management Center (TMC) –Expand signal communication lines –Upgrade existing signal equipment to current national standards (NTCIP) –Implement an incident management system –Install Dynamic Message Signs –Improve traffic flow on Orange County roadways Project Overview

6 Install, Upgrade, and Expand fiber-optics network to 120 miles –Colonial Dr –Old Winter Garden Rd –Hiawassee Rd –Clarcona-Ocoee Rd –Edgewater Dr –Orange Av –University Bv –Dean Rd –Conroy Windermere Rd –Central Florida Pkwy Project Overview

7 Install Monitoring Devices –Silver Star Rd at Hiawassee Rd –Sand Lake Rd at Turkey Lake Rd –E. Colonial Dr at Alafaya Tl –W. Colonial Dr at Pine Hills Rd –Orange Blossom Tl at Oakridge Rd –Orange Blossom Tl at Sand Lake Rd –John Young Pkwy at Central Florida Pkwy –E. Colonial Dr at Goldenrod Rd –International Dr at Convention Wy Project Overview

8 Traveler Information System –SR 535 at Buena Vista –Central Florida Py at Sea Harbor Dr –Sand Lake Rd at Dr Phillips Bv –Sand Lake Rd (SR 482) at Universal Bv –John Young Py at OC Public Works –Orange Blossom Tl (US 441) at 43rd St –Orange Blossom Tl (US 441) at 26th St –Lee Rd (SR 423) at Kingswood Project Overview

9 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

10 Team Members

11 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

12 Traffic Management Center Photo Gallery

13

14

15

16

17

18

19 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

20 Communications Update Phase I

21 Communications Update Phase II

22 Communications Update Phase III

23 Communications Update Cameras and Message Signs

24 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

25 Colonial Drive and Alafaya Trail Average Daily Traffic 109,507 71 Crashes in 2005 Average Daily Red Light Running 2,062 1.88 % Red Light Running Update

26 Colonial Drive and Hiawassee Road Average Daily Traffic 98,490 63 Crashes in 2005 Average Daily Red Light Running 1,748 1.77 % Red Light Running Update

27 Orange Blossom Trail and Holden Avenue Average Daily Traffic 84,665 57 Crashes in 2005 Average Daily Red Light Running 2,147 2.54 % Red Light Running Update

28 Orange Blossom Trail and Sand Lake Road Average Daily Traffic 115,482 56 Crashes in 2005 Average Daily Red Light Running 2,784 2.41 % Red Light Running Update

29 Orange Blossom Trail and Taft- Vineland Road Average Daily Traffic 78,340 31 Crashes in 2005 Average Daily Red Light Running 1,655 3.06 % Red Light Running Update

30 Average Daily Red Light Running Red Light Running Update LocationViolations $180.5 per Ticket Alafaya Tr and Colonial Dr2,062$372,191 Colonial Dr and Hiawassee Dr1,748$315,514 Holden Av and Orange Blossom Tr2,147$387,534 Orange Blossom Tr and Sand Lake Rd2,784$502,512 Orange Blossom Tr and Taft-Vineland Rd2,401$433,381 $2,011,131

31 TRAFFIC MANAGEMENT SYSTEM Project Overview Team Members Traffic Management Center Photo Gallery Communications Update Red Light Running Update Next Steps

32 Operate and Maintain New System Integrate with FDOT System Update Plans for Future Phases Design Phase II with Current Funds Pursue Grants to Construct Phase II Next Steps

33 No Action is Requested Next Steps