Download presentation
Presentation is loading. Please wait.
Published byAlexandra Tyler Modified over 8 years ago
1
CALO News Pascal Perret LPC Clermont 26 November 2014
2
2 LS1 Activities: LHCb LHCb closure week 45-46 CV shutdown: weeks 48, 49 and 50 CV maintenance P8 No cooling on Nov 24,25 400 kW from 26/11 RICH HPD replacement: Jan 2015 Pascal Perret - LPC Clermont 26/11/2014 2 Beam Pipe Installation ECAL CALIB system – fibers replacement Week 26 : operation week #7 RICH HPD replacement Week 19 operation week #6 AUG 12/5 AUG 12/5 W33 B-field measurement CV maintenance 2014 DSO test CV maintenance 2014 W 47 Sector test p8 W31 Neon In LHCb CLOSURE Dipole test w19 Week 36 : operation week #8 Week 42 : operation week #9 Pump down
3
3 Planning 2015 Q1-Q2 Next: One commissioning week end of Jan./beginning of Feb. t.b.s. Sector test 78 last week of February 2015 2 weeks commissioning/heat run before beam Piquet: reduced level w11 – 17; Full level week 18 - Pascal Perret - LPC Clermont 26/11/2014
4
4 LS1 Activities CALO closure Passive dosimeter installation done SPD ECAL HCAL Pascal Perret - LPC Clermont 26/11/2014
5
5 LS1 Activities CALO closure Preparation: Check of electrical control system performed by Laurent B. A bad contact identified in a connector … but it was ok! But problems time to time … (system not very reliable!) Cleaning of vis à bille done by Bruno et al. Problems during ECAL opening: « dust » preventing to open ECAL! Pascal Perret - LPC Clermont 26/11/2014 BeforeAfter
6
6 LS1 Activities CALO closure Nov 4, 6: SPD, Lead, PS and on 13 th : ECAL & HCAL Pascal Perret - LPC Clermont 26/11/2014
7
7 LS1 Activities Pascal Perret - LPC Clermont 26/11/2014 Adjusting End Switch position Adjusting End Switch position A-sideC-side SPD+12mm-6mm PS=+6mm ECAL+5mm= PS-SPD(was) A-side-2.5 mm(12.8mm) C-side+1.5 mm(8.1 mm) Δx ECAL A (2014-2012) ~ 3 mm CALO closure Nov 4, 6: SPD, Lead, PS Adjustment of closing position A-side: ECAL & SPD on PS closed position ECAL end switch adjusted… C-side: PS & SPD on ECAL closed position PS end switch adjusted… Survey: PS&SPD: Nov 5, 11 ECAL: Nov 14
8
8 Without beam pipe protection 6/11/14 6.9 9.2 10.1 PS 4.1 5.7 6.5 8.3 SPD IP C-side A-side 9.6 12.4 IP C A 6.0 IP C A 8.0 9.9 2.5 IP C A 7.8
9
9 Without beam pipe protection 6/11/14 Lea d 0.0 6 10 13. 6 IP C A
10
10 TED RUN Preparation hctell04 replaced http://lblogbook.cern.ch/Common+Spares/116 The Tell1 125 has been replaced by te tell1 117 (1-ORx). The problem of 125 is PP3 lbus: ====== LBit 20 of PP3_lbus_data (DAQL_data bit 4) seems to be bad! The whole lbus (including control signals) seems to be bad! Pascal Perret - LPC Clermont 26/11/2014
11
11 TED RUN Pascal Perret - LPC Clermont 26/11/2014
12
12 TED RUN Or higher intensity during a short period … Pascal Perret - LPC Clermont 26/11/2014
13
13 TED RUN Smooth running TAE Pascal Perret - LPC Clermont 26/11/2014
14
14 TED RUN 2 points to look at PS 1FE/VFE/MAPMT ? To check with cosmics data ECAL ERROR bank? Pascal Perret - LPC Clermont 26/11/2014
15
15 LS1 Activities: LHCb Maintenance MARATON water cooling circuit All done! The Maraton we gave to the e-pool to check connectors is back New water connectors The old one have been analysed (no news yet!) Actions to be discussed for the whole LHCb Maraton … New SPECS: First tests done by Clara on ECHVA/C tomorrow. Is it ok? To do: Calibration: cf Jean-François report We have to define our needs in terms of memory use, CPU time per events, etc. to discuss with online team Piquet training & DOCUMENTATION Pascal Perret - LPC Clermont 26/11/2014
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.