Download presentation
Presentation is loading. Please wait.
Published byKelley Tamsyn Richardson Modified over 9 years ago
2
The Final Link in the Sealift Chain Amphibious Construction Battalion Two
3
Maritime Prepositioning Force Joint Logistics Over The Shore (JLOTS)
4
BENIGN
8
CMPF
17
Chain of Command COMNAVBCHGRUTWO COMPHIBGRUTWO COMNAVSURFLANT CINCLANTFLT ACB-2ACU-2BMU-2ACU-4
18
Mission Areas Causeway Ferry Roll On/Roll Off Discharge Facility (RRDF) Amphibious Assault Bulk Fuel/Water System (AABFS/AABWS) Offshore Petroleum Discharge System (OPDS) Elevated Causeway, Modular (ELCAS-M) Defensive Military Operations Camp Support
19
Barge Ferry System Side Loadable Warping Tug (SLWT) Causeway Section Powered (CSP) Causeway Section Non- Powered (CNSP)
20
MPS-1 Lighterage 4 SLWTs 16 CSPs 14 Intermediates 16 Beach Ends 8 LCM-8s For Dynamic Mix: Instream: 8 rolling stock/hour Pierside: 20/hour.
21
Roll On/Roll Off Discharge Facility (RRDF)
22
5,000 ft of 6” conduit (Fuel) 10,000 ft of 4” conduit (Water) Deploy from Barge Ferry or LCU Install in 8 hours 700Kgal/day Amphibious Assault Bulk Fuel/Water System
23
Offshore Petroleum Discharge System (OPDS) Single Product 4 NM Dual Product 2 NM 1.2 Mgal/day First Fuel in 48 hrs. Total install in 7 days Water Depth 35-200 ft. Service Life 2 yrs.
24
Lighterage support w/ OPDS SLWT Lighterage support: 3 tow tugs Converted lay repair barge 1 SLWT Dive boat - LCM 8 OUB Lighterage support: 3 tow tugs - OUBs Converted lay repair barge 1 OUB Dive boat - OUB
25
Elevated Causeway-Modular - Up to 3000 ft length - 20 FSW at MLW - 7 Days to Erect - UCT Site Survey
26
Defensive Military Operations
27
Camp Support Berthing Tents Galley/Scullery Laundry Showers/Heads Transportation Beach Salvage Water Purification Medical/Admin
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.