Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposed Changes to DOE Project Numbers Len Myers NMMSS Operations DOE/PSI.

Similar presentations


Presentation on theme: "Proposed Changes to DOE Project Numbers Len Myers NMMSS Operations DOE/PSI."— Presentation transcript:

1 Proposed Changes to DOE Project Numbers Len Myers NMMSS Operations DOE/PSI

2 Topics 2  Background  NMMSS use of project numbers  Second Tier Users  Programs/Budgets and Materials Management  NMMSS role  Guidance Requirements  NMMSS Project Information  Final Thoughts

3 Background 3  Historical Structure Char 1: First character of PRIS Chars 2 -3: First 2 characters of B&R (Program Office) Chars 4 – 10:Last 7 characters of B&R (Program, Subprogram,etc.) Problems were associated with all parts of the project number. - First character had lost meaning and not routinely updated - Program office characters were not routinely updated - Characters 2 - 10 did not map to B&Rs

4 4  Project Reports 5 reports 25 locations (RISs) receive one or more of these reports 28 individuals receive one or more of these reports  Financial Reports 4 reports 16 locations (RISs) receive one or more of the reports 19 individuals receive one or more of the reports  Special Request Reports Programmatic inquires Oversight/Assessment inquires External requests How NMMSS Uses Project Numbers In Reports

5 Second Tier Users 5  These users rely on NMMSS generated reports and/or other data containing project numbers to meet customer needs  Nuclear Materials Inventory Assessment (NMIA) activities  Materials disposition activities  Financial reporting activities  Managers of DOE materials at commercial (NRC licensed) facilities

6 Programs/Budgets and Materials Management 6  Historically there was a well defined relationship via project numbers  Relationship strength is now program office/site dependent  Currently does not exist without major crosswalk effort

7 NMMSS Role 7  Collect, validate, and verify data  Produce and distribute reports  Retain historical data/information  Administer the database for the above

8 NMMSS Project Information 8  574 unique active project numbers  438 are being used (i.e. have inventory values)  15 unique letters as first character in project numbers  37 unique values for characters 2 and 3 of project numbers, all but 1 in B&R  52 programmatic RISs (PRIS)  15 unique letters as first character  Union of project and PRIS first character sets but not identical sets PRIS PRIS and Project Project G,W A,C,D,F,H,J,K,L,N,P,Q,R,U E,M

9 April 21 st Proposed Changes 9  Update first character per Table 1-1  Second through seventh characters must be from B&R Second and third characters per Table 2-3 Need to include second and third characters for R, V, and Z pseudo project numbers in Table 2-3

10 April 21 st 1st Character Proposal Table 1-1 In Previous NA-58 Project Number Guidance 10

11 May 10 th 1 st Character Proposal Table 2-1 Current NA-58 Project Number Guidance 11

12 Table 2-3 Program Office Designations

13 Number of PRIS and Unique Projects 13

14 2 nd Through 7 th Versus B&R 14

15 Number of Projects With Reported Inventory

16 Final Thoughts 16  Project number process has improved to meet new and emerging requirements  Project numbers continue to play a significant role in NMMSS reporting and materials management activities  Requirements and responsibilities are documented in the draft guidance  NMMSS will implement defined and documented requirements  Any changes to NMMSS projects for FY 2011 should be submitted by August 1, 2010  Need to update the Standard General Ledger Crosswalk (Balance Sheet Codes, Standard General Ledger, and NMMSS Slotting Criteria)

17 Backup Slides 17

18 Backup Slides 18


Download ppt "Proposed Changes to DOE Project Numbers Len Myers NMMSS Operations DOE/PSI."

Similar presentations


Ads by Google