Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997.

Similar presentations


Presentation on theme: "1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997."— Presentation transcript:

1 1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997

2 2 PSP4a Humphrey on PSP  “a guide to using disciplined personal practices to do superior software engineering”  “The PSP will show you how to plan and track your work and how to consistently produce high-quality software.”

3 3 PSP4a Software Development  Do you know how many lines of code you write per day? (or function points? or modules?)  Do you know how many errors you make?  Watts Humphrey knows how many LOC/day he writes and how many errors/KLOC he makes!

4 4 PSP4a Measurement  Could a person train for running an olympic event without timing their performance?  Would an archer train by shooting at a target but not seeing if the arrows hit the target?

5 5 PSP4a Time Log

6 6 PSP4a Time Log Entries  Date  Start - time in hours:minutes  Stop - time in hours:minutes  Interrupt - time of each interruption in minutes  Delta - start - stop - interrupt  Activity - category

7 7 PSP4a Engineering Notebook  Record all activities related to class  Post on web page – update semi- weekly

8 8 PSP4a Class Discussion  What can we learn from a programming time log?  What are different uses of any knowledge gained from a time log?

9 9 PSP4a Possible Categories  Drawing and revising object model  Writing code  Compiling and correcting syntax errors  Testing code (no currently known errors)  Debugging logic errors (that is, there is an error and you are trying to locate and correct the error - note)

10 10 PSP4a C2 time log  This is a time log that I kept while design a programming problem and producing a solution  My values

11 11 PSP4a Class Discussion  Where my categories good?  What would have been better categories?  Any knowledge from this time log?

12 12 PSP4a Process Improvement  1. Measure  2. Evaluate  3. Modify  Repeat steps 1-3

13 13 PSP4a Planning is essential  You can estimate the effort required for your next project  Accurate estimation comes only with practice.  Estimate the next and then keep log to evaluate and improve estimates

14 14 PSP4a Personal Estimation  The past is the best estimate of the future  Find some size measure of the product –e.g. loc, number of classes, number of functions –determine your productivity based on size –estimate size of next task –calculate effort estimate

15 15 PSP4a Group Discussion  How can we manage our time more effectively?  How can we manage our team members’ time more effectively?  How can we use PSP to improve our team members’ performance?

16 16 PSP4a Class Discussion  What can we learn from a time log of our studying?  What categories would be good for studying?

17 17 PSP4a L4aS17 time log  Keep a time log of your class work for the next week – 6/19 to 6/26  Develop an extensive set of categories  Summary including pie charts and productivity  Turn in your log and an evaluation, summary on 6/27 (on and off)


Download ppt "1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997."

Similar presentations


Ads by Google