Download presentation
Presentation is loading. Please wait.
Published byRhoda Perry Modified over 8 years ago
1
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II - 2012
2
A brainstorming session Concept Paper M.Sc. in IT - Year 1 Semester II - 2012
3
At the end of this session you will understand the requirements of setting up a Network for a new company, budgeting and creation of Concept Paper. M.Sc. in IT - Year 1 Semester II - 2012
4
Analyze the requirements of the company. Allocated budget. Geographical locations of the network. Technical capabilities of the staff of the company. Number of sub-networks Security of the Network M.Sc. in IT - Year 1 Semester II - 2012
5
Selection of the venders and service providers. Type of data/information transported through the network. Bandwidth Requirements. Type of organization - academic/ commercial Routing Protocols used. Company's future plans. M.Sc. in IT - Year 1 Semester II - 2012
6
IPV4 or IPV6 Is VPN required? Centralized or De-Centralized? What is the Back-up plan? Required time line. M.Sc. in IT - Year 1 Semester II - 2012
7
Step 1 : Identify automation areas. Web portal, E-mail Other applications Billing, Inventory control, HR, Finance, VOIP, vedio conferencing or ERP M.Sc. in IT - Year 1 Semester II - 2012
8
Step 2 : Physical locations to be networked WAN, LAN For example identify, Switches for each floor of the building Fiber connections Structured caballing L3 switches for VLANs M.Sc. in IT - Year 1 Semester II - 2012 Source : http://www.google.lk/search?hl=en&gbv=2&tbm=isch&sa=X&ei=podET5OuLo-srAfihqHTDw&ved=0CDoQBSgA&q=Lan,+Wan+setup&spell=1&biw=1366&bih=673http://www.google.lk/search?hl=en&gbv=2&tbm=isch&sa=X&ei=podET5OuLo-srAfihqHTDw&ved=0CDoQBSgA&q=Lan,+Wan+setup&spell=1&biw=1366&bih=673
9
Step 3 : Can connect other existing systems For example identify, Number of users per application Step 4 : Methodology of maintaining the network – Network Management System M.Sc. in IT - Year 1 Semester II - 2012
10
Step 5 : Draw Network diagram For Example, Identify number of buildings and number of floors per each location. Example :- An organization has, Headquarters with 4 buildings and 5 floors each Provincial offices. Branches Regional officers Remote officers Customer service points. M.Sc. in IT - Year 1 Semester II - 2012 Different number of buildings and floors
11
Example :- Headquarters has, For each level get a generic model, because finding buildings, floors and users in every office is time consuming. M.Sc. in IT - Year 1 Semester II - 2012 BuildingFloorUsers 1120 1230..
12
Step 6 : List the physical devices For example identify, 24 port L2 switches, L3 switches Router per center Firewall Servers for web portal, e-mail DNS server, DHCP server Virus guard server Network management server M.Sc. in IT - Year 1 Semester II - 2012
13
Step 6 : List the physical devices For example identify, 24 port L2 switches, L3 switches Router per center Firewall Servers for web portal, e-mail DNS server, DHCP server Virus guard server Network management server M.Sc. in IT - Year 1 Semester II - 2012
14
Step 7 : Caballing Structured caballing per floor Step 8 : Identify software requirements Eg:- Software for servers, ITIL software Step 9 : WAN connectivity Step 10 : Identify operational cost Eg :- Software license cost Maintenance cost WAN fee M.Sc. in IT - Year 1 Semester II - 2012
15
By taking these into consideration we prepare the budget. Using it we prepare the concept paper. We can present the cost phase wise. M.Sc. in IT - Year 1 Semester II - 2012
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.